The Subject Of The Public Procurement Is The Performance Of Works And Activities Related To The Implementation Of The Task Entitled: Modernization Of Sports Fields Within The Orlik Complex In Żychlin, Including The Performance Of All The Works Described In The Bill Of Measure (Auxiliary Document), Which From A Technical Point Of View Are Necessary For Proper Performance And Commissioning Of The Task In Question. Documents Describing The Scope And Manner Of Performing The Task Are Attachments To Swz, I.E. The Works Characteristics - Annex No. 6 To Swz, Graphic Attachment - Annex No. 7 To Swz, The Bill Of Quantities (Auxiliary Document) - Annex No. 8 To Swz, Material Statement Of Video Monitoring - Annex No. 9 To Swz.1) Location Of The Object: Ul. Łukasińskiego 21, 99-320 Żychlin, Journal Of Laws No. 5832) The Scope Of The Task Includes, Among Others, The Replacement And Repair Of The System Fence Elements, Point Repair Of The Bent Spans In Agreement With The Contracting Authority, • Replacement Of Polypropylene Mesh Of Existing Footballs 6 M High And Length Of 17.52 M M2, • Cleaning The Ankle Along With A Pointer On An Area Of 560 M2, • Replacement Of Nets In Goals- 2 Pcs, • Modernization Of Video Monitoring In Accordance With The Material Combination, • Modernization Of Lighting Through The Installation Of Iron Enlargers On The Finished Construction Mvp 506A / 59 250 W With Light Source- 24 Pcs., • Purchase And Assembly Of Small Architecture Elements:- 4 Pcs. Seats 200 Cm Backing And Wooden Seat, Cast Iron Frame With The Possibility Of Mounting To The Ground, Without Armrests, - 2 Pcs. Circular Waste Baskets 70 Liters 70 Cm, - Information Line Containing The Regulations Of The Use Of The Free -Standing Pitch With Dimensions Of 50X70 Cm.3) In Terms Of Performing The Task, The Contractor Should Do All Other Works And Activities The Implementation And Use Of The Task Entrusted To Him, Resulting From Documents Describing The Subject Of The Contract, Arrangements Or Applicable Provisions Of Polish Law And In Accordance With The Art Of Construction. The Contractor Will Perform All Activities Related To Compliance With Health And Safety Rules And Maintaining Order At The Construction Site And Safety (Ohs And Brd Activities); Will Perform All The Necessary Control Measurements Related To The Correctness Of The Works; Will Make All Industry Arrangements, Consultations, Supervisors; He Will Perform Activities Related To The Storage And Utilization Of Waste, As Well As All Other Activities Necessary For The Proper Performance Of The Subject Of The Contract, Which Will Result During Its Implementation And The Commissioning Of The Task For Use. 4) All Building Materials And Colors Before Applying Them Should Be Agreed With The Employer. 5) The Use Of Demolition Material Should Be Agreed With The Investor. The Investor Has The Right To Indicate Recovery Materials Along With The Place Of Deposit, To Which The Contractor Will Take Materials Useful For Further
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.