Traffic-Moranting Equipment-Organizing A Control Center And Monitoring Traffic In Vicovu De Sus. Civil Works - Traffic Light System And Communications Fo Foundation Cabinet Adc 600 X 1000 X 800Mm Pcs 2 Installation And Assembly - Traffic Lighting And Information Automatic Traffic Conducting (Based On Existing Diagrams And Approved For Non -Change) Buc 2 Installation Automatic Cabinet Direction Circulation On Foundation Existence 2 Installation Local Installation Installation Ups 1000Va In Adc Buc 2 Procurement Equipment - Semaphization And Automatic Circulation Information System 2 Curmination Cabinet Circulation Buc 2 Switch Local 12 Ports + Sfp Buc 2 Security Device Cabinet Buc 2 Ups 1000Va Buc 2 Traffic Management Center - Ccc - Hardware Server Traffic Management Puc 1 Server Data Base Base Buc 1 Local Center Center As Ans Center As As As. 1 Central Router Buc 1 Firewall Central Buc 1 Air Conditioning 24,000 Btu Buc 2 Fire Detection System As 1 Sisem Automatic Fire Fire 1 Ups Central Puc 1 Security System And Access 1 Rack Equipment Electrogene 30Kva Puc 1 - Software License Traffic Management Ans 1 Electrical Installation Ans 1 Design Technical Project And Execution Details Set 1 Technical Assistance And Obtaining Opinions Set 1 3.2 Minimum Specific Requirements Regarding The Public Procurement A. Design Services Within The Design Stage Will Be Provided: A) The Technical-Economic Documentation For The Dtac + Dtoe + Pt And Dde Phases; B) Ensuring The Technical Assistance Services From The Designer During The Entire Period Of Execution Of The Works, Participating In The Determining Phases, Participating In The Reception At The Completion Of The Works And In The Final Reception And The Participation In The Elaboration Of The Technical Book Of The Construction According To The Legal Norms In Force; A) Carrying Out The Technical-Economic Documentation For The Dtac + Dtoe + Pt And Dde Phases With The Necessary Requirements; The Designers Obligation Includes: A. Elaboration Of The Following Documentation: A. Technical Documentation For Obtaining All Opinions And Agreements; B. The Project For Authorizing The Execution Of The Works; C. The Project To Organize The Execution Of The Works; D. Technical Project And Execution Details Verified According To The Legal Provisions, For The Quality Requirements, By Certified Specialists; E. Preparation Report At The Completion Of The Execution; F. The Program Of Tracking The Behavior In Time Of The Construction; G. The Technical Book Of Construction. B. Related Services: A. Obtaining All The Opinions, Agreements, Including The Building Permit Requested By The Urbanism Certificate, (The Payment Of Taxes Comes From The Final Beneficiary Of The Investment And Will Be Made On The Basis Of Supporting Documents). B. Verification Of Technical Documentation According To Law 10/1995; C. Technical Assistance During The Period Of Exe
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.