The Subject Of The Construction Intention Is To Improve The Energy Efficiency Of The School Building In Niwiski And Renovation Along With The Reconstruction Of The Rooms Of The Nutritional Facilities, Building On Plot No. 173/2, Precinct Niwiski, Mokobody Commune. As Part Of The Task, I Predict The Insulation Of Walls, Ceilings, Replacement Of Co Installations And Modernization Of The Boiler Room, Modernization And Renovation Of The Water And Sewage System, Modernization And Replacement Of Electrical And Teletechnical Installations, Renovation Works In The School And Preschool Complex Of The Public Primary School. Władysław Reymont In Niwiska. Renovation Works Will Include Repair Work After Replacing The Installation, I.E. Replacement Of Carpets, Filling, Painting Walls And Replacement Of Window And Door Joinery. The Renovation Of The Nutritional Facilities Includes, Among Others: Demolition Of Partition Walls, Demolition Of A Closed Chimney, Widening Existing Door Openings, Construction Of Partition Walls, And Replacement And Reconstruction Of Internal Installations. Performing Kitchen Technology And Facilities. 2) The Scope Of Works Includes, Among Others: • Demolition Works • Insulation Of Walls • Replacement Of Installations Co • Reconstruction Of Nutrition Room Rooms • Modernization Of The Boiler Room • Replacement Of Liners • Wall Painting • Replacement Of Window And Door Joinery Description. Description Of The Subject Of The Contract Was Included In The Design Documentation, Which Consists Of Annex No. 1 To Swz, Which Consists Of: A). Area-1 Pc., Architectural And Construction Design- 1 Pc., Technical Design- Architectural And Construction- 1 Pcs., Technical Design Of The Electrical Industry- 1 Pcs., Technical Specification Of The Implementation And Receipt Of Works Electrical Industry- 1 Pcs, Technical Design Of The Sanitary Industry- 1 Item, Thermomodernization Of The School Building: Architectural Technical Design- 1 Pc., Technical Design Of The Electrical And Teletechnical Industry- 1 Pc, Technical Specification And Acceptance Of Works Electrical And Teletechnical Industry- 1 Pcs, Technical Design Sanitary Industry- 1 Pc; Detailed Technical Specification Sanitary Industry- 1 Pcs, Detailed Technical Specification Of The Construction Industry- 1 Pcs., Congresses- 5 Pcs (Construction Industry: Construction, Sanitary, Electrical, Co Installation And Equipment) Additional Requirements: A) After Completing The Works Together With A Written Report Of Readiness For Receipt, The Contractor Is Required To Submit A Performed Cost Estimate Signed By The Contractor And Developed On The Basis The Bill Of Quantities Attached To The Specification Of The Terms Of The Contract. After The Completion Of The Subject Of The Contract, The Contractor Is Obliged To Prepare And Transfer To The Ordering Party As -Built The Awarding Cost, Which Will Take Into Account The Scope Of The Work Performed And The Actual Costs Of Their Implementation. This Cost Estimate
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.