1. The Subject Of The Contract Is The Design And Execution Of Construction Works Covering The Construction Of A Water Treatment Station As Part Of The Implementation Of The Task Entitled: Construction Of A Water Treatment Plant In Kiev. Realization Of The Subject Of The Contract Was Divided Into The Following Stages: 1) Stage 1 - Covering The Implementation Of Project Documentation; 2) Stage 2 - Including The Performance Of Construction Works Together With The Aspired Documentation. The Contract To Design The Entire Scope Of Construction Works, Taking Into Account Both Current And Promising Demand For Water And Execution Of Construction Works In Accordance With Pfu And Documentation Of Proceedings. News! The Designer Is Obliged To Verify The Design Assumptions Described In Pfu And, As A Consequence, Optimize The System For Effectiveness. At The Same Time, The Designer Is Obliged To Optimize Water Treatment Costs By Designing A Modern Facility With Low Operating Costs And Low Energy Consumption. The Contractor Will Be Responsible For Conducting Works In Accordance With The Contract And For The Quality Of The Materials Used And Performed Works Used, For Their Compliance With Project Documentation, Sst Requirements, Work Organization And The Instructions Of The Supervisory Inspector. The Standard Of Living Of The Population By Increasing The Availability Of Drinking Water And Improving Its Quality. The Program Will Contribute To The Achievement In The Area Covered By The Application Of European Standards And Norms Specified In The European Parliament And Of The Council (Eu) 2020/2184 Of December 16, 2020. On The Quality Of Water Intended For Consumption By People And The Applicant For Co-Financing Of The Minister Of Health On The Quality Of Water Intended For Consumption, The Concise Description Of The Subject Of The Contract, Description Of The Requirements Of The Employer In The Scope Of Implementation And Acceptance Was Specified In The Functional And Utility Program, Hereinafter Referred To As Pfu, Constituting An Attachment No. 9 To Swz And The Predecessor, On The Basis Of The Existing State Presented In Pfu And In Accordance With The Requirements Of The Employer Regarding The Design And Implementation Of The Construction Of A Water Treatment Plant, To Perform Project Documentation Together With Obtaining All Arrangements, Opinions, Permits And Decisions, With The Exception Of An Environmental Decision, For Which The Proceedings Are Already In Progress And Implementation Of The Described Investment Intention; 2) Refer To The Implementation Of The Subject Of The Contract. Apply Provisions That Ensure The Availability Of People With Special Needs By Using Universal Design Or Rational Improvements Referred To In The Act Of 19 July 2019 On Ensuring Availability Of People With Special Needs (Journal Of Laws 2024 Item 1411), And In Later Execution, Absolutely Follow Them; 4) To Accomplish The Task In Accordance With It And Approved By The Ordering Pa
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.