Quotation Are Invited For Auxboiler-87 Sling Tube Surface Mechanical And Manual Cleaning At L-Ii Station

Tender Detail

96564863
2332501200
Self-Funded
Quotation Are Invited For Auxboiler-87 Sling Tube Surface Mechanical And Manual Cleaning At L-Ii Station
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
19-05-2025

Work Detail

Quotation are invited for Auxboiler-87 Sling Tube Surface Mechanical and Manual Cleaning at L-II Station, Jebel Ali. TECHNICAL AND GENERAL SPECIFICATION OF AUXBOILER-87 SLING TUBE SURFACEMECHANICAL AND MANUAL CLEANING AT L-II STATION, JEBEL ALI.NAM E OF THE WORK:MANUAL CLEANING OF AUXBOILER-87 SLING TUBESTUBE SIZE: 50.8 OD LENGTH : 4.5 MTRNO OF TUBES- 122 NOSPERIOD OF WORK:10 DA YSSCOPE OF WORK:MANUAL CLEANING OF AND DEPOSIT COLLECTION OF AUXBOILER-87 SLING TUBES,BUT NOT LIMITED TO THE FOLLOWING.1.#THE CONTRA CTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETYMEASURES ETC., BEFORE SUBMITTING HIS BID.2.#TO GET A PTW, CONTRACTOR HAS TO SUBMIT RISK ASSESSMENT AND METHODSTATEMENT REGARDING THE ABOVE J OB PRIOR TO START THE WORK.3.#CHECK CONDITION SUITABLE TO CARRY OUT WORK. CONDUCT SITE SURVEY ANDSAFETY INSPECTION TO ASSESS THE WOR KING ENVIRONMENT.4.#IF WORKING ENVIRONMENT IS SAFE PROCEED THE FOLLOWING STEPS.5.#MOBILIZE THE REQUIRED SKILL MANPOWER, TOOLS , PPES , EQUIPMENT ANDCONSUMABLES, ETC. ON 3 DAYS NOTICE PERIOD WITH SUPERVISOR AND SAFETYOFFICER.6.# SAFETY MEETING WILL BE HELD TO EVALUA TE THE RISK INVOLVED INMETHODS TO BE USED. RISK ASSESSMENT AND TOOL BOX TALK TO BE GIVEN TO THEEMPLOYEES.7.#A SUPERVISOR SHALL BE AP POINTED TO CONTROL ANY BOILER TUBE CLEANING.THE SUPERVISOR SHOULD BE THOROUGHLY COMPETENT AND FULLY CONVERSANT WITHALL THE APPLICABL E SAFETY REGULATIONS AND PROCEDURES, INCLUDING THECHARACTERISTICS OF THE PRODUCT BEING HANDLED PRIOR TO AND DURING THEPERIOD OF BOIL ER TUBE CLEANING OPERATIONS.8.#NO ACCESS IS PERMITTED UNTIL THE ENTIRE BOILER HAS BEEN COOLDOWN9.#THE FIRST TIME ENTRY INTO THE SUPE R HEATER-3 SHALL BE AFTEROBTAINING OF DEWA CONFINED SPACE ENTRY PERMIT.10.#DEWA CONFINED SPACE ENTRY PERMIT SHOULD BE RENEWED EVERY DAY AS ITIS VALID FOR ONE DAY ONLY.11.#AFTER REMOVAL OF THE DEPOSIT , CONTRACTOR MUST COLLECT ALL THEDEPOSIT AND HAND OVER TO DEWA W ITH PROPERLY12.#THE SUPERVISOR SHALL MAINTAIN A SAFE OPERATION UNTIL THE TANK HASBEEN COMPLETELY CLEANED. THE SUPERVISOR WILL MONITO R CHANGES INCONDITIONS AND ADAPT THE CLEANING ACTIVITY ACCORDINGLY.13.#AFTER COMPLETION OF ALL REPAIR JOBS CONTRACTOR WILL RESPONSIB LE TODO THE HOUSEKEEPING.14.#DE MOBILIZATION AND SITE CLEARANCE.15.#DETAILED REPORT AFTER COMPLETION OF JOB WITH PHOTOS.SAFETY GUIDE LINES:1.#A FORMAL WRITTEN ENTRY PERMIT OR WORK PERMIT IS ALWAYS REQUIRED.2.#ENSURE PHYSICAL ISOLATION OF THE TANK FROM ANY OTHER TAN KS ANDPIPELINE.3.#ALL ELECTRICAL AND INSTRUMENTATION EQUIPMENT WILL BE ISOLATED ANDPOWER SOURCE DE- ENERGIZED BEFORE MAINTENANCE WOR K IS CARRIED OUT4.#ENSURE AN ADEQUATE RISK ASSESSMENT HAS BEEN CONDUCTED AND DOCUMENTEDTO MINIMIZE ALL RECOGNIZED RISKS BEFORE THE P IPE CLEANING5.#PERSONNEL ENTRY/EXIT REGISTERS TO BE MAINTAINED NEAR THE ENTRYMANHOLE DOOR OF THE TANK.6.#DURING THE WORK INSIDE THE SUPERHEATER-3 , KEEP WATCHMAN AT MAN WAYFOR SAFETY. THE SAFETYMAN AT THE MAN WAY SHALL BE EQUIPPED WITH ARADIOPHONE AND AIR BLOW HOR N.7.#THE APPOINTED WATCHMAN SHALL KEEP AN ENTRY /EXIT LOG TO MAINTAIN ARECORD OF THE TIME SPENT INSIDE THE SUPERHEATER-3 AND BREAK TAKENOUTSIDE THE BOILER . THIS LOG SHALL REMAIN AT THE POINT OF ENTRY AT ALLTIMES UNTIL COMPLETION OF THE SHIFT AND GIVEN TO THE TEA M LEADER ONCOMPLETION OF THE PROJECT.8.#ALL REQUIRED PPE SHALL BE USED AT ALL TIMES.9.#THE AMBIENT AIR MUST CONTINUE TO BE CHECKED O N A DAILY BASIS OR ATSHIFT CHANGES.10.#ENSURE THAT ANY MECHANICAL EQUIPMENT USED (I.E. PUMPS, BLOWERS,EJECTORS, ETC.) IS POWERED BY COMPRESSED AIR OR HYDRAULICS.11.#SPARK IGNITION ENGINES SHOULD NOT BE USED UNLESS VEHICLE ISPROVIDED WITH SPARK ARRESTOR. ENTRY TO T HE WORK AREA AND THE OPERATIONOF TRANSIENT VEHICLES/ PLANT (E.G. CRANES, FORKLIFT TRUCKS ETC.) Qty: 1 Auxboiler-87 Sling Tube Surface Mechanical and Manual Cleaning at L-II Station, Jebel Ali. For technical queries clarification contact <(><<)>r Arunkumar. Phone: 04-322-6104 arunkumar.sethuraman@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501200)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail