Construction, Delivery And Commissioning Of The K2 Biomar Boiler In The Area Of The Industrial Zone Žďárského, Kořichovice-Třebíč, In The Energy Kec In The Premises Of The Factory. The Subject Is The Design Design, Supply, Production Of Assembly And Commissioning Of The New K2 Boiler With A Thermal Output Of 2-2.4 Mwt. It Will Also Include A Fuel Tray, Ash Management, Flue Gas Cleaning, Connection To Existing Wiring And Control System, Incl. Building Parts Of The Cladding Of The Building Of New Operation K2. The Design Of The Design Must Be Considered With The Connection To The Czt And The Coordination Of The Operation Of The Cogeneration Center, The Biomas Boiler K1 And The Heat Pumps. The Building Part Will Also Include The Kolte K2 Headquarters, Which Will Be Located On The Roof Of The Boiler Room In The Form Of A Container Headquarters With Access Stairs, Respectively. Location Of The Command In Another Part Of The K2 Boiler Room.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.