The Subject Of The Order Is The Relocation Of The Existing Uniform Sewage With The Dn500 Mm Profile. The Purpose Of The Construction Is To Create A Prerequisite For Trouble -Free Drainage Of Waste Water On The Existing Wwtp. The Section Of The Existing Uniform Sewerage System Designed For Relocation Is Stored Under The Building Of Alfa Metal, Plot No. 479/2 In The Cadastral Area. Žernovník (582760). It Is An Existing Dn500 Concrete Pipe, Which Is In Poor Technical Condition. The Relocation Of The Sewerage System Will Be Realized Using Classic Technology In An Open Hung Trench. The Section Of The Existing Sewerage System Will Be Alfa Metal Will Remain In Operation And Will Be Used To Drain Rainwater From The Surface Of The Road And Paved Areas Of The Area. The Sewer Material Is Designed By A Ribbed Sewer Sewer Pipe Made Of Polypropylene (Full Rib In The Wall Cut), Dimensional Series According To Din 16 961 560/500 (Wall Thickness Between Ribs At Min.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.