The Purpose Of The Procurement Is To Enter Into A Contract For Detailed Design, As Well As The Preparation And Implementation Of Competition For Execution Contract (General Contract According To Ns 8406), For Construction Stage 2 Of The Burial Ground At Frugarden. The Design Also Involves The Preparation Of Material For An Application For Approval From The State Manager, Cf. Sections 2, 3 And 4 Of The Burial Ground Regulations. In Addition To The Geotechnical Survey. The Execution Contract. In This Context, Projects Must Take The Height Of The Vegetation That Is In The Area Today. The Design Must Be Based On The Enclosed Illustration Plan (Appendix 11) And Utilization Of Construction Stage 1 As A Reference Project. Projects Must Themselves Revise The Illustration Plan In Accordance With The Current Zoning Plan And At The Same Time Take The Height Of What Is Imperative To Link The Two Building Steps Together To A Healthy Burial Ground. Note: The Illustration Plan In Appendix 11 Contains Several Elements That Do Not Appear From The Dwg Files From Building Stage 1, Such As Judging The Seating And Waterposts. All Providers Are Encouraged To Conduct A Sight Experience At The Burial Ground From Construction Stage 1, Before They Deliver Offers.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.