Electrical Services-Kyffhäuser Barracks, New Construction Central Weapons Chamber Building, Elt (Plant Groups 4 And 5). The Procurement Includes The Allocation And Commissioning Of The Specialist Planning Of Technical Equipment (Elt (Plant Groups 4 And 5) According To Hoai, Part 4, Section 2 Using The Bim Work Methods-According To § 55 Of The Hoai-Performance Phases 2 And 3 And Then, If Necessary, The Further Level Of The Further Performance Phases 5-8, There Is No Right. On The Eastern Outskirts Of Bad Frankenhausen On The B 85. In Principle, Environmental Law Is To Be Used In The Planning And Implementation Of The Construction. Approx. The New Building (Egb) Is To Be Planned In The Low-Energy Standard. Building Is Provided With An Access Control System That Is Integrated Into The Existing Key Management System. The Design Of The Construction Is On The Ga. Performance Is To Be Used By The Bim Work Method.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.