Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services-General Planner Performance-New Construction Of A 3-Fold Sports Hall At The Heinrich-Heine-Gymnasium (School Center Nette)
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services-General Planner Performance-New Construction Of A 3-Fold Sports Hall At The Heinrich-Heine-Gymnasium (School Center Nette)
Architectural, Construction, Engineering And Inspection Services-General Planner Performance-New Construction Of A 3-Fold Sports Hall At The Heinrich-Heine-Gymnasium (School Center Nette). 1. Objective 1.1 The Subject Of The Order / Performance Profile Based On The Results Of The Project Development, The General Planner Performance For The Service Phases 1-2 Of The Hoai Including The Creation Of A Flb And Quality Assurance During The Further Planning And Construction Phase, As Well As The Performance Phase 9. The Basic And Special Services Are Defined In More Precisely In The U01 General Planning Service. 1.2 Interfaces As A Result Of The Complexity Of The New Construction In Connection With The Environment And The Large Number Of Necessary Construction Work Will Result In Numerous Interfaces That Must Be Taken Into Account. In Order To Ensure A Low -Conflict Construction Process, It Is Important To Define All Of These Interfaces At An Early Stage And To Bring Them Into Accord With The Construction Concept. 1.2.1 Integration Of The General Contractor From Lph. 3 Will Be Necessary To Integrate A General Contractor. The General Planner Supports This Process And Ensures That The Previous Plans Are Taken Into Account Accordingly. He Is Responsible For Quality Assurance During The Further Planning And Construction Phase For The Entire Project. 1.2.2 Decision And Change Management The General Planner Supports The Decision And Change Management In Accordance With The Requirements Of The City Of Dortmund. This Includes The Creation Of Necessary Documents And The Implementation Of Corresponding Changes. 1.2.3 Target Agreement Qng The General Planning Must Comply With The Target Agreement Within The Framework Of The Qng. Here The Quality Goals Are Determined In Advance And The Implementation Is Monitored. The Exact Design Of The Interfaces Requires Close Cooperation Between Everyone Involved In Order To Ensure A Smooth Project Process.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.