Tenders Are Invited For Construction Economics Services - Surveying Performance For The Electrification And Expansion Project Aschaffenburg - Miltenberg
Tenders Are Invited For Construction Economics Services - Surveying Performance For The Electrification And Expansion Project Aschaffenburg - Miltenberg
Construction Economics Services - Surveying Performance For The Electrification And Expansion Project Aschaffenburg - Miltenberg. The Project Electrification And Expansion Aschaffenburg - Miltenberg Is To Be Carried Out As Part Of The Bavarian Electromobility Strategy Schiene (Bess). The Route Is To Be Electrified, Expanded In Sections In Two Ways To Expand A Sulzbach Crossing Station On The Main And The Speed In Part. This Is Intended To Increase The Capacity And Flexibility Of The Route In Such A Way That The Introduction Of A Half -Hourly Cycle Free Of Conflict Is Made Possible. With The Electrification And Expansion Of The Aschaffenburg - Miltenberg Railway Line, Various Measures For Decarbonization, Increase In Capacity And Acceleration Are To Be Implemented And Rail Passenger Traffic (Spnv) Is Thus More Attractive. The 39-Kilometer Transport Connection Is Made Up Of The Vzg Route 5220: Aschaffenburg Hbf- Bft Miltenberg West And From The First Two Kilometers Of The Vzg Line 5224: Bft Miltenberg West-Wertheim. With The Electrification And Expansion Of The Maintalbahn, Transfer-Free Spnv Connections From Miltenberg To Frankfurt (Main) And Darmstadt Are To Be Made Possible With Electrical Traction. Due To The Installation Space Required For The Overhead Line, Adaptations Of Various Bridge And Tunnel Structures As Well As Track Reductions Are Required Along The Entire Route. In Accordance With The Operational Requirements, The Resulting From The Proposed Vehicles, All The Required Platforms Are Brought To A User Length Of 215 M (Order Length 220 M) And Raised To 76 Cm. This Also Results In Adjustments And New Buildings Of The Platforms To Restore Complete Accessibility. The Project Electrification And Expansion Aschaffenburg-Miltenberg Is Not Part Of The Ten-Core/Overall Network; The Project Electrification And Expansion Aschaffenburg - Miltenberg Is Not Part Of The High -Performance Network (Hln); The Project Is Not Anchored In The New And Expansion Strategy Of The Network Concept Of Db Infrago Ag. The Traffic Objective Of The Overall Project Electrification And Expansion Aschaffenburg - Miltenberg Includes Ensuring The Necessary Capacities In Spnv For The Forecast Horizon 2034 With Economically Optimal Operating Quality.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.