The Deep, Channel And Road Construction Work Advertised Here Serve To Open Up The Vardingholt Construction Area In Rhede. Hauptmassen: Sw And Rw Sewerage, Rrsb, Construction Roads Approx. 4,520 M³ Of Upper Off, -Ac Cover. 2,590 M³ Excavation Channels. 4,700 M² Construction Of The Baugrubena. 2,040 M³ Of Pipe Support, Pipe Beds. 715 M Deep Drainage. 225 M Field Drainage. 645 M Planumdrainagenca. 12 M Rw Channel Da 315 Ppca. 35 M Rw Channel Da 400 Ppca. 11 M Rw Channel Da 630 Ppca. 230 M Rw Channel Dn 300 B/ Sbca. 117 M Rw Channel Dn 400 B/ Sbca. 112 M Rw Channel Dn 800 B/ Sbca. 73 M Rw Reinforced Concrete Frame Profile 1000X750 Mmca. 158 M Rw Reinforced Concrete Frame Profile 1250X750 Mmca. 430 M Sw Channel Da 250 Ppca. 435 M Connecting Line There 160 Ppca. 40 St Channel Shafeca. 6,070 M³ Of Excavation Rain Recourse. 830 M³ Excavation/ - Installation Baustraßa. 5,840 M² Of Ground Strength Building Plan Plan. 1,485 M³ Of Frost Protection Layers. 1,980 To Gravel Layers. 400 To Gravel Banketta. 530 M² Of Water -Bound Road Strengthca. 18 St Street Runs. 3,080 M² Bitum. Raising Fasteners. 2,020 M² Lawn Anaatca. 325 M Fence Systems
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.