r01800 - Prequalification - Framework Agreement Design Services Team Eba In Mime - 101064 . Defense Building Shall Enter Into Parallel Framework Agreements On Design Services For Team Eba In Mime. Parallel Framework Agreements Will Be Signed With Up To Two Suppliers. In This Context, Suppliers Are Invited To Apply For Prequalification To The Competition. The Framework Agreement Will Help To Meet The Clients Need For Counseling And Design When Carrying Out Several Projects In Several Locations. The Locations Are Graded. The Framework Agreement Mainly Includes Assignments In Connection With The Advice Of Renewal Of Infrastructure At Existing Buildings And Facilities Around The Country. The Agreement Can Also Be Used For New Buildings If This Is Considered Appropriate At A Location. At Each Location, The Project Will Need Key Resources. Key Resources Are Limited To Rie, Riv, Ritb, Pgk And Rib Respectively. Discipline Needs Will Vary From Location To Location For The Remaining Subject. The Service Includes General Advice In Construction And Civil Engineering. Including The Design And Preparation Of Description Texts Based On Ns 3420. Infrastructure In Locations Throughout The Country. A Complete Design Group With Resources Must Be Provided In All Necessary Subjects. It Is Assumed That The Following Will Be The Largest Disciplines: Rie (Consulting Engineering Electrical, Both Low- And High Voltage) Ritb Responsible (Responsible For Integrated Technical Building Installations) Riv (Advisory (Consulting) Rib: And Overwater) Sheets (Advisory Architect) Pgk (Design Group Coordinator) Rice Security Departure Rope Leader Supplement Is Considered The Following As Relevant Disciplines And Will Be Included In The Deliveries (The List Is Not Exhaustive): Ribr (Fire Advisor) Rig (Consulting Engineer Geoteknik Building Physics) Rim (Advisory Environment) Bim Coordinator Rive (Advisory Engineering Road) Hydrologist Search (Responsible Applicant) Supplier Shall Provide Resources For All The Above Disciplines. The Need For The Different Subjects Will Vary In The Different Phases. Defense Buildings May Also At Any Time Have Framework Agreements That Fully Or Partially Overlap With This Agreement. The Main User Of This Agreement Is Project And Development (Pou). Other Departments In The Defense Building Can Also Use The Agreement In Accordance With The Agreement With The Contractual Agreement Total Value Is Estimated At Nok 200 Million Excl. The Vat Competition Applies To A Competition Over The Eea Threshold Values Laid Down In The Regulations On Defense And Safety Acquisitions (Fosa) And Follows The Rules In This Regulation Section I And Ii. The Competition Is Carried Out As A Limited Tender Competition. This Is A Form Of Competition With Prequalification, Which Means That Only Suppliers That Meet The Qualification Requirements Will Be Able To Submit Offers. See The Enclosed Competition Documents For Supplementary Information. Only Applications For Prequalification With Associated Documents Will Be Submitted, See Section I - Phase 1 - Pre -Qualification Phase, Section 7.2. The Selected Pre -Qualified Will Then Have Access To The Complete Invitation Document In Phase 2 - The Tender Phase. Here, Providers Will Be Informed Of Deadlines For Tender Submission, As Well As Requirements For The Offers.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.