The Subject Of The Contract Is The Implementation Of Construction Works As Part Of The Investment Task Entitled Modernization Of The Sports Complex My Playground - Orlik 2012 In Rudniki. Investment Involvement Consists In Modernizing The Existing Sports Complex My Playground - Orlik 2012 In Rudniki And The Construction Of A Climbing Wall. The Operation Is Co -Financed From The Fund For The Development Of Physical Culture, Which Is The Disposer Of The Minister Of Sport And Tourism As Part Of The Program Of Modernization Of Sports Complexes My Field - Orlik 2012 - Edition - 2024. The Modernization Of The Orlik Will Include: 1) Replacement Of The Surface From The Synthetic Grass Of The Football Pitch And Goals With Mesh And Football (Dismantling And Utilization Of The Current Surface, Laying A New Surface, Replacement Of Goals, Renovation Of Footballs); 2) Repair Of The Polyurethane Multifunctional Surface, Strengthening The Surface And Renewal Of The Game Lines; The Repair Will Consist Of Cleaning The Surface Of The Pitch, Its Impregnation And Laying A New Mat. 8 Mm From Epdm; 3) Replacement Of Boards And Basketball Rims; 4) Repair Of Damaged Pitch Fence Elements; 5) Renovation Of The Social And Soccer Facilities Building; 6) Renovation Of The Drainage Installation Of The Field By Replacing The Wells; 7) Correction Of The Position Of Pedestrian Routes (Resulting From The Replacement Of The Above-Mentioned Studdle). Buldering (External): 1) Year-Round, Made Of Laminate, Resistant To Weather Conditions Up To 3 M High; 2) Intended For Climbing Without Belaying For People Of All Ages And Different Degrees Of Skills In The Field Of Recreational And Sporting Climbing; 3) With Sand-Gravel Sand Absorbing Surfaces; 4) Equipped With 160 Pieces Of Climbing Grains; 5) Led Lighting With 46W Led Lighting, Which Will Be Mounted On The Existing Lighting Mast Of The Orlik.Ww. The Bouldering Wall Will Be Located Next To The Orlik Object, Creating One Common Sports Base. It Will Enable Comprehensive Sports Development Of The Commune And Region. Investment. Other Necessary Media. In Connection With The Immediate Vicinity Of The School And The Nursery, The Area Transferred To The Introduction Of Bystanders Should Be Protected. Communication Within The Sports Complex Will Not Have Architectural Barriers In The Form Of Stairs And Thresholds. Sidewalks Are Made Of Cobblestones With A Width Of Min. 1.5 M At Ground Level Ensuring Adequate Communication Of People With Special Needs. The Cloakroom And Sanitary Building Will Be Equipped With A 90 Cm Wide Door, Without Thresholds, Enabling Free Ride Of The Trolley. In Addition, A Toilet Adapted For Disabled People Will Be Renovated In The Building Equipped With A Toilet Bowl With Handles, A Sink With Handrails Installed At The Appropriate Height. Modernization Of The Eagle Does Not Require A Permit Or Construction Application. The Assembly Of The Climbing Wall Requires A Construction Notification. The Notification Was Submitted
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.