The Subject Of This Contract Is Construction Of Renewable Energy Installations In Buildings And Public Facilities In The Panki Commune. Implemented Under The European Funds Program For Silesia 2021-2027 Priority Ii European Funds For Green Development Action 02.06 Renewable Energy Sources - Projects Other Than Grant And Umbrella, Including In Particular: 1) Conducting A Technical Audit (Local Vision) For Each Location: A) Panki Commune Office - Al. Tysiąclecia 4, 42-130 Panki; Plot Id: 240606_2.0011.254/4 (Basement Of The Building Of The Instal. Pv Office On The Roof Of The Building), B) Panki Commune Office - Al. Tysiąclecia 4, 42-130 Panki; Plot Id: 240606_2.0011.254/4 (Container Built Next To The Solar Installation - Pv Installation For The Needs Of Carport With Electric Car Charging Station) .2) Execution (In 3 Copies) Of Project Documentation For Each Location Indicated In Chapter Iii Point 1 Point 1) A) And 1) B) Swz, Obtaining The Required Arrangements, Commitments And Permits And Opinions (Building Permit, Or Notification Of Construction Or Performing Other Construction Works If Required By Law), Opinions And Arrangements In The Field Of Fire Protection, Etc.) Necessary For Proper Preparation Of Project Documentation; The Developed Design Documentation Must Comply With The Principle Do Not Do Significant Damage - The Dnsh Principle, Analysis Of Compliance With The Principle Do Not Do Serious Damage (Dnsh), Within The Meaning Of Art. 17 Of Regulation (Eu) No 2020/852, Taking Into Account The Indicated Scope Of Work And The Nature Of The Investment. The Design Working Must Also Include The Implementation Of The Opening/Final Report Report, Describing The Planning, Implementation, Implementation, Monitoring And Investment Settlement In Accordance With The Dnsh3 Guidelines) Construction According To The Principle (Dnsh) Do Not Do Serious Damage. 5) Preparation Of The Area For The Implementation Of The Subject Of The Contract; 6) Delivery And Installation Of Energy Warehouses For Photovoltaic Installations Together With Accessories For Each Location Indicated In Chapter Iii Point 1 Point 1) A) And 1) B), Swz; 7) Connection/Configuration Of Energy Warehouses With Photovoltaic Installations; 8) Delivery And Assembly Of Hybrid Inverters For Photovoltaic Installations With Accessories; 9) Supplementing Walls, Ceilings And Floors, Repair Of Plaster, Facade And Insulation, Sealing The Roof Covering After Cable Passes; 10) Making Any Modification Of Assumptions Only In Consultation With The Investor, If It Leads To Better Use Of Technical Capabilities Created By The Device Planned For Assembly; 11) Making Possible Modifications, Configuring The Designed Cabling So As To Lead To The Optimal Use Of Technical Capabilities Created By The Device Planned For Assembly; 12) Conducting Checking Measurements, Conducting Installation Efficiency Tests, Starting And Adjusting The Installation; 13) Performing All Reproductive Works; 14) Users Training; 15) Prepara
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.