Tenders Are Invited For Air-Conditioning Appliances-Delivery, Installation, Installation And Guarantee Support Of Inverted Type In The Rhif Building-Vratsa
Tenders Are Invited For Air-Conditioning Appliances-Delivery, Installation, Installation And Guarantee Support Of Inverted Type In The Rhif Building-Vratsa
Air-Conditioning Appliances-Delivery, Installation, Installation And Guarantee Support Of Inverted Type In The Rhif Building-Vratsa. Delivery, Installation, Installation And Warranty Maintenance Of Air -Conditioning Inverter Type In The Building Of Rhif - Vratsa. 1. Heating/Cooling Air Conditioning Inverter Type Must Meet The Minimum Requirements Specified In Item 1 Of Section I Of The Technical Requirements And Specifications - Annex No To The Order Documentation. 2. The Offered Air Conditioners (Inverter Wall Split Systems) Should Meet The Technical Parameters Referred To In Item 2 Of Section I Of The Technical Requirements And Specifications - Annex No To The Order Documentation. 3. Delivery Conditions And Requirements 3.1. The Offered Air -Conditioning Technique Must Be New, Unused And Be Included In The Manufacturers Product List For 2024 Or 2025 3.2. When Installing The Air Conditioners In The Site Of The Contracting Authority, All Pipes And Cables Should Be Laid In Decorative Channels. 3.3. Installation Of The Delivered Air Conditioners Should Be Carried Out With Minimal Impact On The Current Work In The Objects Of The Contracting Authority. 3.4. The Volume Of Installation Work Also Includes The Necessary Construction Works (Including The Delivery Of Materials) For Obstruction Of Openings, Plastering And More. Similar. 3.5. The Volume Of Installation Work Also Includes The Dismantling Of Existing Air -Conditioning Equipment Indicated In The Distribution Of Air Conditioners By Type And The Object Of The Contracting Authority. 3.6. El. The Power Supply Is Provided By The Existing Electrical Network In The Room Where The Air -Conditioning System Is Installed. In Case Of Need To Extend The Power Line, This Is At The Expense Of The Contractor. 3.7. The Average Distance Between The Inner And The Outdoor Unit Is 5 Meters. The Drainage Pipes Of The Bodies Are Taken With A Slope Of At Least 2 % Per Linear Meter. Connecting The External To The Internal Units Is Done With Copper Pipes. The Internal Bodies Are Installed In A Place In Coordination With The Contracting Authority. The Pipes Are Strengthened Vertically And Horizontally With Brackets According To The Standards For Strengthening. All Pipelines, With The Exception Of Drainage, Are Insulated With Thermal Insulation. 3.8. Input Construction Products For The Installation Of Air -Conditioning Systems Must Provide Load -Bearing Capacity And Resistance To The Structure; Thermal Efficiency; Fire Safety; Protection Of The Health Of Working And Living And Environmental Protection. 3.9. When Delivering The Delivery, The Contractor Shall Provide The Contracting Authority With The Warranty Cards Of The Air Conditioners And The Guides For Their Use, On Paper. 4. Requirements For The Quality And Compliance Of The Air Conditioners Offered. When A Participant Is Not The Manufacturer Of The Offered Air Conditioners, He Or She Is To Submit A Document (S) To His Technical Proposal From The Manufacturer Of The Equipment Or His Official Representative For Bulgaria, Certifying His Right To Sell And Warranty Service Of Air Conditioners On The Territory Of The Republic Of Bulgaria. This May Be A Contract, An Authorization Letter Or Other Equivalent Document. Authorization Documents To Prove The Conformity With The Easy Placed
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.