The Purpose Of This Project Is To Construct Approximately 150M Of Type 2 Trail And 220 M Of Pedestrian Boardwalk, Within The Undeveloped 10-Meter-Wide Wieland Road Right-Of-Way.The Work Generally Consists Of, But Is Not Limited To, The Following:Trail Construction: This Project Includes The Construction Of Approximately 150M Of Type 2 Trail.Type 2 – Crusher Fine Surface Paths: These Trails Are Suitable For Low To Moderate Use And Should Accommodate Hiking, Running, Biking, And Limited Use By Equestrian Riders And Should Be Barrier-Free, And Accessible. Grades Should Be Less Than 6% And The Trail Must Be Adequately Crowned To Accommodate Grades Between 6% And 12%. Refer To Attachment 4 For Construction Specifications. Trail Construction Works Include, And Are Not Limited, To The Following: Scraping/Excavating Approximately 150 M Of The Trail Surface Down To Mineral Soiltrail Cross-Section Is 2-Meters-Wide With A 1.5-Meter-Wide Running Surfaceditching/Culverts As Requiredspun Geotextile On Cleared Trail Surface75mm Of 20Mm Minus Road Base75mm Of 10 Mm Crusher Fines/Screenings Pedestrian Boardwalk Construction: This Project Includes The Construction Of Approximately 220M Of Pedestrian Boardwalk. Refer To Attachment 4 For Construction Specifications. Boardwalk Construction Works Include, And Are Not Limited To, The Following: Boardwalk Surface Width 1.5-Metersdiamond Piers Are Specified; However, Helical Piers, Gabion Baskets, Or Other Low Impact And Comparable Inorganic Pier Design Will Be Considered. Cedar, Chromated Copper Arsenate (Cca) Treated Fir Are Specified; However, Rough Cut Fir, Rough Cut Yellow Cedar, Or Other Comparable Lumber Will Be Considered.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.