To Ensure The Correct Construction And Implementation Of Groundwater Monitoring Stations, The Following Objectives Must Be Established: Initial Data Collection - Make An Exhaustive Compilation Of Hydrogeological Data In The Study Area To Fill The Current Information Gaps. - Obtain Data On The Net Basis Of Aquifers, Stratigraphy And Other Key Elements Before The Construction Of Piezometric Stations. Geophysical Prospecting Studies - Perform Geophysical Prospecting Studies In The Study Area Using Accepted Methods Such As Electromagnetic Transfers (Tes) And/Or Electrical Resistivity Tomography. - Use Studies To Obtain Precise Information On Soil Stratigraphy, The Net Basis Of The Aquifer And The Depth Of The Water Mirror. - Identify The Maximum Depth And Vertical Distribution Of Groundwater To Influence The Optimal Design And Location Of Wells. Preliminary Well Design - Define The Proper Diameter And Depth Of The Pipe Based On Geophysical Studies. Considering These Objectives, The Company Must Prepare A Preliminary Technical Proposal That Includes The Following: ✓ Geophysical Method (S) To Use. ✓ Justification Of The Selection Of Methods. ✓ An Tentative Layout Of The Points Where The Studies Will Be Carried Out. ✓ Ensure That The Preliminary Technical Proposal Meets These Requirements, Otherwise It Will Be Declared Inadmissible.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.