Excavating And Earthmoving Work- New Building Combined Indoor And Outdoor Pool In Memmingen; Pipeline Trenches. The City Of Memmingen, Stadtwerke Memmingen, Is Planning To Build A New Combined Halls And Outdoor Pool As An All -Year Bath, Stadtbadallee 3 (Flnr. 3757/10, 3757/11 And 3747/3). The Entire Building Is Designed And Planned As A Passive House. All Construction Structures Meet The Requirements Of A Passive House And Are Met In Close Coordination With Building Physics. The New Building Is To Be Realized On The Area Of The Existing Outdoor Pool After Demolition Of The Inventory. The New Combined Bath Includes A 25-Meter Swimming Pool With 8 Lanes In The Indoor Pool Area, A Jumping System 1 Meter / 3 Meters, A Teaching Pool With Approx. 12.5 X 10 Meters, A Course Pool With Lifting Floor, A Small Children, And Other Attractions. In The Area Of The Outdoor Pool, A 50-Meter Pool With 6 Lanes, A Non-Swimmer Pool With Approx. 500 M² With Various Attractions And A Small Children With Approx. 100 M². In Addition, A Beach Volleyball Field, A Playground And The Like, Outbuildings With Changing Rooms, Sanitary Areas And Kiosk Are Built In The Outdoor Facilities. Further Details Can Be Found In The Service Description. The Contract Begins With A Surcharge (Probably 23-25. Kw 2025). Start Of Work At The Latest 2 Working Days After Receipt Of The Order Letter. The Performance Must Be Completed (Ready To Take Off) Within 235 Working Days After The Deadline Mentioned Above For The Start Of Execution. Individual Period: Creation Of The Indoor And Outdoor Pool With Lawn And Parking Space - 140 Working Days From The Start Of Execution.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.