Plumbing And Drain Laying Work-New Construction Fire Brigade, Darmstadt / Heat Exchanger Channel. Darmstadt Intends A New Construction Of A Main Fire Station For The Professional Fire Brigade. For The New Guard, A Plot Of Land Is Available At The Northwestern Entrance To Darmstadt, At The End Of The B42, Directly Southwest Of The Gräfenhäuser Straße/Pfnorstraße Partial Hub. The Property Has An Area Of Approx. 30,317 M² And A Terrain Height Of Approx. 121.7 Munich Up To 123.7 Munich. In The Preparation Of The Construction Work, The Channel Routes Crossing The Construction Site Are Relocated Or Renovated. The Sewer Dn 1500, Which Crosses The Property, Is Replaced By A New Channel With A Rectangular Cross -Section (Re 2500X1000). A Wastewater Heat Exchanger System With A Length Of 2 X 40M Is Installed In This New Channel. This System Extracts Thermal Energy From The Waste Water And Thus Increases The Efficiency Of The Heat Pump Systems. This Heat Exchanger Route With Planning, Production And Installation Of The Heat Exchangers In A New Channel Section Is Part Of The Tender. The Concrete Channel Is Treated In A Separate Tender And Is To Be Built Directly Before Installing The Heat Exchanger System. The Heat Exchangers Are Installed By An Integration Opening In The Lid Of The Channel With A Size Of 2.5 X 2.5 M.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.