Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Naty - New Dyverdon Workshops - General Planning Services For The Partial Phases Sia 31 To 53
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Naty - New Dyverdon Workshops - General Planning Services For The Partial Phases Sia 31 To 53
Architectural, Construction, Engineering And Inspection Services - Naty - New Dyverdon Workshops - General Planning Services For The Partial Phases Sia 31 To 53. The New Cffs Dyverdon-Les-Bains Workshops, Dedicated Mainly To The Heavy Maintenance Of The Long-Distance Trains Fleet, Are Planned To Be Carried Out In Several Work Phases Between 2029 And 2041. They Will Include 3 New Long Ways, A New Production And Distribution Of Energies, A Dentreprise Restaurant, Social Surfaces (Offices And Changing Rooms, New And Sanitized), Quadrilateral And The Northern Halls, A New Bogies Workshop On 1 Level, As Well As The Temporary Logistics Zone, West Of The Icn Hall. The Scope Of The Project Also Includes The Reorganization Of The Entire Track Beam Between The Workshops And The Station, The Displacement Of The Yverdon-Les-Bains Overflow Roads In Bonvillars, As Well As The Relocation Of The P+Rail, Probably In The New Underground Car Park In Place Darmes, Carried Out At The Initiative Of The City Of Yverdon-Les-Bains. It Should Be Emphasized That The Perimeter Of The Project Is Divided Into Two Stages, A First Priority Step, Below Called Step 1 Naty, Autonomous And Coherent, Which Will Be Produced Primarily (Horizon 2030-2040), And In A Second Step, Without Name Or Time Horizon At Present (Hereinafter Step 2). The Step 1 Naty And Itself Divided Into 4 Phases Of Work, Not To Be Confused With The Usual Sia Phases. The 4 Work Phases Are As Follows: * Phase 1 - C10 Long Lanes, D7.2 Energies, A5 Login, Admin And Restaurant; * Phase 2 - Sanitation B2 And B2n Login, Construction Halle Bogies C9; * Phase 3 - Sanitation B1, B3, B4 And C1; * Phase 4 - Sanitation C2 And C7. This Market Includes The Sia 31 To 53 Phases For The 4 Work Phases Of Step 1 Naty. The Start Of The Avant-Projet Is Scheduled For October 2025 And The Commissioning Of The Different Phases Of Work Of Letape 1 Naty Are Currently Planned Between 2032 And 2041.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.