Quotation Are Invited For G Station Block Desalination Unit And Seawater Pipe Rack Hydro Blasting, Coating And Nut Bolt Replacement Work

Tender Detail

96457693
2332501176
Self-Funded
Quotation Are Invited For G Station Block Desalination Unit And Seawater Pipe Rack Hydro Blasting, Coating And Nut Bolt Replacement Work
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
15-05-2025

Work Detail

Quotation are invited for G Station Block 10 Desalination Unit 13 and 14 Seawater Pipe Rack Hydro Blasting, Coating and Nut Bolt Replacement Work. REPLACEMENT OF NUT, BOLT, WASHER AND HYDRO BLASTING AND COATING OF PIPERACK STRUCTURE IN G STATION DESALINATION PLANT.1.0#SCOPE OF W ORKA.#THE SCOPE INCLUDES SITE PREPARATION, SURFACE PREPARATION, ANDAPPLICATION OF PROTECTIVE COATINGS ON PIPE SUPPORT STRUCTURE IN G STATION DESALINATION PLANT #13 &14.#B.#SUPPLY OF BLASTING EQUIPMENT, SEALANTS, CLEANING AGENTS, COATINGMATERIALS, APPLICATION AND IN SPECTION TOOLS & EQUIPMENT AND ALLCONSUMABLES INCLUDING TARPAULIN AND/OR GREEN MESH TO COVER IN ORDER TOPROTECT THE ENTIRE AREA FROM SPILL/SPLASH OF BLASTING AND PAINTINGMATERIALS AND PROTECTING THE ENVIRONMENT.#C.#REMOVAL OF THE EXISTING COATINGS AND ALL OTHER CO NTAMINANTS BY HYDROBLAST CLEANING AND APPLICATION OF COATING SYSTEM BY AIRLESS SPRAYEQUIPMENT. #D.#MANUAL CLEANING USING HAND AND PO WER TOOLS AND APPLICATION OFCOATINGS BY BRUSH APPLICATION ARE ACCEPTABLE ONLY WHEREVER NECESSARY ANDIN NON-REACHABLE AREAS. #E.#APPL ICATION OF COMPLETE COATING SYSTEM IN COMPLIANCE WITH EXISTINGCOATING SYSTEMS FOR ALL THE COMPONENTS UNDER THIS SCOPE.#THE COATINGSY STEM SHALL BE SUGGESTED BY THE BIDDER AND APPROVED BY DEWA.#F.#SAFETY AND STAGE WISE INSPECTIONS AND QUALITY ASSURANCE ATCOMPLETION OF EACH ACTIVITY.#G.#PREPARATION OF CHECK LISTS AND REPORTS AT THE BEGINNING, DURING ANDEND OF EACH ACTIVITY.H.#THE BIDDER SHALL PRO VIDE DETAILED PROCEDURES WITH ACTIVITY BREAKDOWNINCLUDING METHOD STATEMENT AND RISK ASSESSMENT FOR THE SCOPE OF WORK.#I.#REMOVAL OF OLD CORRODED FASTENERS, SUPPLY AND INSTALLATION OF NEWFASTENERS FOR STRUCTURAL JOINTS AS PER SITE CONDITION, FOR FASTENERSSIZE, BIDD ER IS REQUESTED TO VISIT THE SITE UNDERSTAND THE EXACT SIZEAND QUANTITY.J.#BIDDER IS REQUESTED TO REPLACE THE NUT AND BOLTS ONE BY O NE,K.#ALL BOLTS, NUTS AND WASHERS SHALL BE HOT DIP GALVANIZED ANDSUBSEQUENTLY CENTRIFUGED IN ACCORDANCE WITH BS729. NUTS SHALL BE TA PPEDUP TO 0.4MM OVERSIZE AFTER GALVANIZING AND THE THREADS SHALL BE OILED TOPERMIT THE NUTS TO BE FINGER TURNED ON THE BOLT FOR THE FULL LENGTH OFTHE NUT.L.#HANDING OVER FINAL REPORT WITH ALL CHECK LISTS TO CONCERNED DEWAENGINEER.##2.0#CONTRACTOR#S GENERAL RESPONS IBILITIES AND LIABILITIESA.#SITE VISIT CAN BE MADE ANY WORKING DAY FROM MONDAY TO FRIDAY,BETWEEN 07:30 TO 14:30 HOURS WITH PRIOR APP OINTMENT FROM CONCERNEDDEPARTMENT SRMANAGER OF DEWA.B.#THE CONTRACTOR SHALL SPECIFY SCAFFOLDINGS REQUIREMENTS AND LOCATIONSCLEARLY TO DEWA DURING PREPARATION STAGE.#C.#DURING SCAFFOLDING ERECTION, CONTRACTORS SHALL DEPLOY THEIR SAFETYOFFICER AND SUPERVISOR ALONG WITH SCAFFOLDING SUPERVISOR TO CONFIRM THEREQUIRED SCAFFOLDING/ACCESS IS IN-LINE WITH THE SAFETY REQUIREMENTS TOSAFELY CARRY OUT CO ATING WORKS. SCAFFOLDING SHALL BE CHECKED EVERY DAYBY THE CONTRACTOR#S QUALIFIED INSPECTOR AND SAFETY OFFICER BEFORE USE.ANY OBSERVA TIONS SHALL BE IMMEDIATELY REPORTED TO THE DEWA INTERFACEENGINEER/ DEPUTY MANAGER.##D.#CONTRACTOR SHALL PROVIDE APPROPRIATE SAFETY A ND PROTECTION EQUIPMENTFOR ALL THE PERSONNEL INCLUDING FIRST AID KIT.#E.#CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID ANY DAMAGES TO THEPLANT EQUIPMENT WHILE CARRYING OUT THE WORKS. FOR ANY DAMAGE CAUSED BYCONTRACTOR TO DEWA PROPERTY DURING THE COATING PROCESS, CONTRACTOR SHALLBE HELD LIABLE TO REPLACE DAMAGED EQUIPMENT AT HIS OWN COST.##F.#CONTRACTOR WORKING ON-SITE MANDATORILY MUST ADHERE TO, BUT NOTLIMITED TO, THE FOLLOWING ENVIRONMENTAL POLICIES:#-·#SUPPORT OUR INTEGRATED MANAGEMENT SYSTEM POLICY.·#HELP US TO ACHIEVE OUR ENVIRONMENTAL OBJECTIVES AND TARGETS BYCONSERVING RESOURCES, ENERGY AND WATER AND BY MINIMIZING WASTE WHILSTON-SITE.·#PREVENT P OLLUTION WHEREVER POSSIBLE.·#FOLLOW ANY PROCEDURE IN THE ENVIRONMENTAL MANAGEMENT SYSTEM THAT ISRELEVANT TO YOUR ACTIVITIES IN ACCOR DANCE WITH THE SITE MANAGERSINSTRUCTIONS.·#PHASE OUT THE USE OF OZONE DEPLETING SUBSTANCES ON OUR SITE.·#ALWAYS COMPLY WITH THE LEG ISLATIVE REQUIREMENTS OF DUBAIMUNICIPALITY.G.#CONTRACTOR CLEARS THE SITE ON A DAILY BASIS BEFORE LEAVING THE SITEAFTER DAY#S WORK AN D LEAVE THE SITE IN AS IS CONDITION.#H.#CONTRACTOR HAS TO COMMENCE THE WORK WITHIN 48 HOURS OF INTIMATIONAND SHALL COMPLETE ALL THE RELATED FORMALITIES LIKE MOBILIZATION OFSTAFF, TOOL & PLANT MACHINERIES.#I.#THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO TH E EQUIPMENTDUE TO POOR WORKMANSHIP. ANY DAMAGE TO THE EQUIPMENT BY THE POORWORKMANSHIP, WRONG HANDLING ETC., THE COST WILL BE RECOVE RED FROM THECONTRACTOR.J.#IN SPITE OF ALL THE CARE TAKEN BY THE CONTRACTOR AND HIS WORKMEN, IFANY OF THE PLANT ITEMS ARE DAMAGED OR DEFACED OR OTHERWISE MADEIN-OPERATIONAL BY THE CONTRACTOR#S MEN, THIS SHALL BE FORTHWITH REPORTEDTO DEWA ENGINEER IN-CHARGE OF THE J OB TO AVOID FURTHER DAMAGES,BREAKDOWN OR SHUTDOWN OF THE TOTAL PLANT.#K.#CONTRACTOR SHALL WORK IN ACCORDANCE WITH INTERNATIONAL CODE S ANDSTANDARDS AT EACH STAGE OF WORKS. IN ALL CIRCUMSTANCES, LOCAL GOVERNINGRULES SHALL BE ADHERED TO.3.0#COATING SPECIFICATIONSURFA CE PREPARATION: HYDRO BLAST CLEANING, MANUAL AND MECHANICALCLEANING.PRIMER COAT: SURFACE TOLERANT EPOXY COATING. DFT # 150 MICRONSM ID COAT#: POLYAMIDE CURED EPOXY COATINGS. DFT # 125 MICRONSTOP COAT#: POLYURETHANE COATINGS. DFT # 50 MICRONSTOTAL DFT # 325 MICRO NSCOLOR CODE FOR STRUCTURE: LIGHT BLUE#- RAL 5012PAINT MANUFACTURER: ONLY GLOBALLY RENOWNED COATINGS SHALL BE USED SUCHAS HEPMEL, JO TUN, SIGMA, AKZANOBEL, ETC.CONTACT PERSON MOHAMMAD RAFI HOSUR - MOHAMMAD.HOSUR@DEWA.GOV.AE048044964 / 0529740743 Qty: 1 G Station Block 10 Desalination Unit 13 and 14 Seawater Pipe Rack Hydro blasting, coating and nut bolt replacement work. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501176)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail