GTR 96450113
Tenders Are Invited For Roof Repair Above The Connector At The Second High School Of Helena Malczewska In Zawiercie
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
96450113
Tendering Authority
Subscribe to view
Tender No
SRZP261-0026/25
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Roof Repair Above The Connector At The Second High School Of Helena Malczewska In Zawiercie
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
27-05-2025
Closed
Work Detail
1. The Subject Of The Contract Is The Execution Of Construction Works As Part Of The Roof Repair Above The Connector At The Second High School Helena Malczewska In Zawiercie. 2. The Subject Of The Contract Includes, Among Others: 1) Replacement Of Roofing From Bituminous Roofing Felt With Thermosal Felt (Primer And Surface), 2) Performing Processing From Topped Roofing Papa Along With Cleaning And Impregnation (Area ~ 215 M2), 3) Replacement Of Flashings, Including The Replacement Of Gutters And Trigger Pipes, 4) Sealing Trigger Machines, 5) Replacement Of Ventilation Fireplaces, 6) Translating The Lightning Protection System At The Place Of Repair Works3. A Detailed Type, Scope And Manner Of Execution Of Works Was Specified In Stwiorb (Annex 9 To Swz), A Pre -Works Of Works (Annex 8 To Swz) And The Designed Provisions Of The Future Contract (Annex 2 To Swz) 4. Having Reference To The Subject Of The Contract, As Well As In Accordance With The Documents Of The Contract Indicated In Para. 3. 5. Warranty: The Contractor Is Obliged To Grant A Minimum Of 36 -Month Warranty Period For Construction Works Constituting The Subject Of The Contract (Including Materials), Which Starts Its Course From The Date Of Signing The Final Acceptance Protocol Of Works Without Comments. Nourse: The Period Of Warranty Granted By The Contractor, Constitutes In This Proceeding The Non -Rescue Criterion For Evaluation Of Offers. The Contractor Declares The Warranty Period In The Offer Form, Constituting Annex 1 To Swz. The Method Of Evaluation Of Offers In The Criterion Warranty Period (G), Was Described In Detail In Chapter Xx Swz.6. Insurance: The Contractor Throughout The Entire Period Of Implementation Of The Subject Of The Contract (I.E. From The Date Of Conclusion Of The Contract To The Date Of Final Acceptance Of The Works) Is Obliged To Have Current Civil Liability Insurance (Civil Liability) For The Material Damage Caused (Property Of Third Parties And Entrusted Property) Arising In Connection With The Implementation Of The Subject Of The Contract. The Contractor Will Be Obliged To Submit An Appropriate Document In This Respect, At The Latest On The Day Of Signing The Public Procurement Contract, In Accordance With The Provisions Of Chapter 21St Para. 3 Point 2/ Swz.7. The Subject Of The Contract Should Be Carried Out In Accordance With Applicable Regulations, The Principles Of Technical Knowledge, Including: The Act Of 7 July 1994. Construction Law And The Act Of 11 September 2019. Public Procurement Law And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021. On The Detailed Scope And Form Of Project Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works As Well As The Functional And Utility Program, The Regulation Of The Minister Of Development And Technology Of December 20, 2021. On Determining The Methods And Grounds For Preparing An Investor Cost Estimate, Calculating Pl
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
54c526d5-9b68-49bc-aaa3-2e62042b4293.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.