1) Task 1 - Recreational Land Development At The Village Common Room In Droszków1. The Subject Of The Order Is The Recreational Development Of The Area At The Village Common Room In Droszków And The Construction Of The Playground In Przykuk, I.E.: 1) Task 1 - Recreational Development Of The Area At The Village Common Room In Droszków - Land Development At The Rural Common Room In The Field, Recreational Sheds And Small Architecture Facilities On Plots No. 248/51.248/53 And 53 And 53 And 53 248/54 Located In The Town Of Droszków, Commune The Partition, In The Field Of Works Resulting From The Attached Construction Project For The Purposes Of This Public Procurement Procedure, Was Excluded On The Construction Of An Outbuilding And An External Gym. The Outbuilding Is Planned For Implementation As Part Of The Second Stage Of Work, While The External Gym Has Already Been Made. The Reduced Scope Of Work Was Included In The Precipitation Of Works; 2) Task 2 - Construction Of A Playground In Przykuk - At Ul. Ruczajowa On Plot No. 480/9 Przesie Przycz, Commune The Partition, The Scope Of Works Include Leveling Of The Area, Assembly Of Ready Devices On The Playground For Children With Safe Surface And The Construction Of The Terrain Fence. 2. The Tasks Are Co-Financed From The European Agricultural Fund For The Development Of Rural Areas, Program: Strategic Plan For The Common Agricultural Policy For 2023-2027 (Ps Wcd 2023-2027), Name Of Intervention Ps The Detailed Scope Of The Subject Of The Contract (Task 1 And 2) Is Determined By The Design Documentation, Which Constitute An Integral Part Of The Specification Of The Terms Of The Contract (Annexes 4 To Swz) And The Provisions Of The Works - Annexes 5. The Issues Were Attached Only To The Auxiliary. 4 The Contractor Will Carry Out Works From New Materials And Own Equipment, Which He Will Buy And Deliver To The Construction Site At His Own Expense And Risk. The Cost Of Purchase And Delivery In Place Of Building All Materials And Devices Used To Implement The Subject Of The Contract Is Included In The Contractors Remuneration. The Materials And Devices Used During The Implementation Of Works Must Have, In Accordance With The Legal Provisions In Force In This Respect, Admission To Application In Construction. Demolition Materials Are The Property Of The Ordering Party. 5. The Contractor Is Obliged Throughout The Entire Period Of Implementation Of The Subject Of The Contract To Employ Persons Performing Activities Related To The Implementation Of The Subject Of The Contract, I.E. Direct Performance Of Construction Works In The Scope Of All Industries - All Physical Workers Performing Construction Works At The Construction Site, Technical Staff Of Construction, With The Exception Of Construction Manager (Applies To Tasper 1), Works Manager (Applies To Task 1), Only On The Basis Of Employment In The Meaning Of The Provisions Of The Act Of 26 June 1974. Labor Code (Journal Of Laws Of 2025, Item 277). 6. The Sub
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.