1.1. Implementation Of Project Documentation Together With Obtaining All Necessary Opinions, Arrangements And Administrative Decisions, Including Obtaining A Building Permit, Broken Down Into 2 Sports Complexes Orlik 2024, As Below: A) Construction Of The Orlik 2024 Sports Complex At Ul. Zinkowa In Legnica- In The Formula Design And Build In Accordance With The Functional And Utility Program, Including, Among Others: The Construction Of A Football Field With Synthetic Grass Surface (Details Of The Required Grass Parameters Were Included In Chapter 4-Dokumam_ Pfu, The Contracting Authority Informs That It Also Allows The Grass Parameters- Indicated In The Chapter 4 Annex _ Permissible Grass Parameters), Construction Of A Multifunctional Pitch With Polyurethane Surface, Construction Of Sanitary And Switching Facilities, Construction Of Hardened, Mounting Footballs, Assembly Of Fences, Assembly Of Fences, Lighting, Assembly Of Pitches, Assembly Of The Equipment Of The Fields, Assembly Of Small Architecture Elements, Execution Of External Installations (Electrical, Water-Sewage), Execution Of The Drainage Of Precipitation Water. (Drainage) Along With The Performance Of The Absorbent Well, Execution Of The Monitoring Installation, Replacement Plantings, Delivery And Assembly Of The Information Board Regarding Co -Financing. B) Construction Of The Orlik 2024 Sports Complex At Ul. Jaskółcza In Legnica- In The Formula Design And Build In Accordance With The Functional And Utility Program, Including, Among Others: The Construction Of A Football Field With Synthetic Grass Surface (Details Of The Required Grass Parameters Were Included In Chapter 4-Dokumentation_ Pfu, The Contracting Authority Informs That It Also Allows The Grass Parameters- Indicated In Chapter 4- Annex _ Permissible Grass Parameters), Construction Of A Multifunctional Pitch With Polyurethane Surface, Construction Of A Fitness Playground, Construction Of Sanitary And Switching Facilities, Construction Of Hardened, Mounting, Assembly Of Footballs, Assembly Of Fences, Lighting, Assembly Of Lighting, Assembly Of Pitch Equipment, Assembly Of Small Architecture Elements, Construction And External Installations (Electrical, Water And External Installations (Water, Water And External Sewage System), Drainage Of Rainwater Along With The Implementation Of The Retention And Residual Reservoir, Execution Of The Monitoring Installation, Delivery And Assembly Of The Information Board Regarding Co-Financing.1.2. Performing Authors Supervision Over The Implementation Of The Investment.1.3. The Transfer Of The Object To The Ordering Party Together With A Final Decision On The Permit To Use. The Order Of The Order Includes: Developing Project Documentation Together With Obtaining All Opinions, Arrangements And Decisions, Including And A Building Permit Decision, Which Should Be Agreed With The User - The Department Of Education, Culture And Sport Of The Legnica City Hall And A Representative Of The Munici