1. The Subject Of The Contract Is Construction Works Entitled Repair And Replacement Of The Facade Of The Gym. 2. The Subject Of The Contract Is Described In Detail In Annex 3 To Swz3. The Contracting Authority Requires The Contractor To Supervise The Works In Order To Supervise The Works. The Contractor Will Transfer The Contracting Manager To The Contracting Authority Immediately Before The Conclusion Of The Contract4. Place Of Implementation: School Complex Janusz Korczak In Szydłów, Szydłowo 43, 64-930 Szydłowo. 5. The Warranty Period And Warranty For The Subject Of The Contract - A Minimum Of 24 Months (Warranty Period And Warranty Is The Criterion For Evaluating Offers In Accordance With Point 18 Of Swz). 6. The Contracting Authority Requires The Contractor To Conduct A Local Vision. 1) The Submission Of The Offer Must Be Preceded By A Local Vision. 2) Local Vision Place: School Complex Janusz Korczak In Szydłowo, Szydłowo 43, 64-930 Szydłowo.3) Taking A Local Vision Is Possible After Determining The Deadline, From Monday To Friday From 8:00 To 15:00) In Order To Arrange A Local Vision, Contact The Secretariat Of The School Tel. 672161129 Local Information Will Be Prepared From Completing A Local Vision - The Template Is Annex 5 To Swz.6) Submitting An Offer Without Completing A Local Vision Results In Rejection Of The Offer. 7. Building Materials Necessary To Perform The Contract Must Correspond As To The Quality Of The Requirements Of Products Approved And Use In Construction, And Have Current Approvals Or Declarations Of Compliance With Technical Approval. 8. If The Documents Describing The Subject Of The Contract Contain The Names Of Material Manufacturers Or Any Other Products Or Products, They Only Serve To Determine The Desired Standard Of Performance And Determine The Properties Of Technical And Utility Requirements Founded In The Technical Documentation For A Given Type Of Solution, They Are Not Binding And Should Be Treated As A Designer Proposals. They Are Not Binding The Future Contractor For Their Use. The Contractor May Apply Equivalent Materials With Technical And Functional Parameters Corresponding To At Least The Parameters Of The Materials Proposed In The Project Documentation. The Contractor Is Obliged To Have Documents Confirming The Permission To Use/Built -In (Certificates Or Declarations Of Functional Properties) In Relation To Equivalent Materials. Equivalent Materials Are Allowed, Provided That: 1) They Guarantee The Implementation Of The Order In Accordance With Qualitative, Technological And Operational Assumptions Contained In The Design Documentation And Swz, 2) Ensure Obtaining Technical, Technological And Qualitative Parameters At Least Equal Parameters Assumed In The Project Documentation And Sw Building Are Equivalent To Those Proposed In The Project. If The Materials Do Not Confirm The Equivalence, The Contractor Will Not Be Entitled To Their Use And At His Own Expense Replace For Materials That Meet The Eq
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.