1. The Order Includes The Execution Of Works Without Project Documentation, Based On The Application Of Construction Works Not Requiring The Building Permit. The Task Being Issued For Implementation Includes The Renovation Of Poviat Road No. 3118E On The Dąbrowa Section - The Border Of The Sławno Commune On A Section With A Length Of 0.830 Km From Km 4+680 To Km 5+510.2. Source Of Financing: The Order Is Carried Out As Part Of The Government Road Development Fund3. Detailed Description Of The Subject Of The Contract: Material Scope For The Implementation:- Corrective Session Of The Existing Surface,- Reproduction Of The Surface At The Places Of Groundbreaking Places And Broken Edges Of The Road With Enchantment With An Asphalt Mass In The Amount Of 100 Kg/M2,- Leveling The Existing Surface With A Layer Of Asphalt Concrete Ac11w With An Average Thickness Of 5 Cm. 125Kg/M2,- Circulation Of The Abrasive Thickness 4 Cm. With Ac11s Asphaltobetone,- A Bilateral Roadside At 0.830 Km From Broken Aggregate 0-31.5Mm Gr. 15 Cm., - Understanding Existing Ditches, - Horizontal Marking, - Replacement Of Energy -Consuming Barriers To The Culverts Of The Gathering Material Scope Provided For Implementation Includes Works Indicated In The Preface Of The Works. The Removal Requires, At The Time Of The Start Of Construction Works, Settings At The Place Of Implementation Of The Task Of Information Boards, Taking Care Of Their Technical Condition (Damaged Or Illegible Board, The Contractor Lists Or Renews On His Own Cost). Every Time The Values Of The Task And Financing Change, The Information Board Should Be Improved Immediately, So That The Values Presented On It Remain Valid In Accordance With Annex 9 To Swz. The Removal Requires That When Laying The Abrasive Surfaces When Connecting Transverse And Longitudinal Seams, Use Sealing Tapes (Thermoplastic). In Addition, The Contractor Marks The Robots In Accordance With The Draft Traffic Organization For The Duration Of The Works And Provides Geodetic Service - Determining The Main Points Of The Facility, Service During Implementation And As -Built Inventory. These Skills Are Not Subject To Separate Payment And Will Be Specified In The Contractual Amount. The Contractor Is Obliged To Secure Geodetic Points During The Performance Of Works. In The Event Of Destruction, It Is Obliged To Reproduce Them At His Own Expense. The Useful Materials From The Demolition Are The Property Of The Contracting Authority. The Contractor Is Obliged To Develop Them In Accordance With The Provisions In The Pre -City Robot And Cost Estimate. The Remaining Materials Useful, After Cleaning, Transport To The Road Region Of The Bridge In Opoczno Accordingly And There In An Orderly Manner To Assemble In The Indicated Place. The Usefulness Of The Materials Is Assessed In Consultation With The Employer Supervision Inspector. Demolition Materials, Including Debris And Pollution, Excess Land And The Land Useless Should Be Removed At The Contract
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.