1. The Subject Of The Contract Is The Execution Of Construction Works In The Field Of Reconstruction Of Municipal Road No. 109416 L Together With Supplementing Street Lighting In Pawlychy, Length 146 M.1) The Scope Of Work Includes: A) Strengthening The Edge Of The Road; B) Performance Of A New Bituminous Surface; C) Making The Road Improvement; D) Supplementing The Missing Street Lighting. 2) Drogia Cross-Section) Road Width 5.5 M; B) Road Cross-Section With A Roof Slope-2%; 3) Pavement Construction: A) Road On Reinforcements:-Construction Of Concrete C8/10 Gr. 15 Cm;-Aggregate With Aggregate 0/31.5 Top Layer, Layer Thickness After A Thickening Of 15 Cm;-Construction From The Min. Ac 16P Kr 2 Gr. 6 Cm; B) Roadway:-Asphalt Emulsion In An Amount Of 0.5 Kg/M2;-Compensatory Condition From Min.-Biyum Ac 16W Kr 2 Gr. 4 Cm;-Asphalt Emulsion In The Amount Of 0.5 Kg/M2;-Gneak-Fiber Geosiacs 100/100 Kn/M2;--I Ac 11W Kr2 Gr. 4 Cm;-Asphalt Emulsion In An Amount Of 0.3 Kg/M2;-Abrasive Compounds From Min. Ac 11S Kr 2 Gr. 4 Cmc) Paved Roadsides With Broken Aggregate With A Fraction Of 0/31 Mm, Gr. 10 Cm; 4) Construction Of Street Lighting Cable Line: A) Construction Of A Street Lighting Line With A Yakxs 4X25mm2 Cable Located In A Cable Trench; B) Under The Bridge, The Cable Should Be Placed In A Steel Curtain Pipe Fi 200; C) Steel Curtain Pipe Fi 200 Mm Under The Bridge - Dismantling Of The Existing And Installation Of A New One M Set On The Factory Foundation - 3 Pcs; E) Fittings Mounted On A Arc Boil With A Height Of 1 M And Boom 1 M F) Led Lighting Fixtures With A Socket And Zhaga Controller - 3 Pcs; 5) Finishing Works: A) Placing The Slopes And Crown Of The Embankment; B) Sowing The Slopes In The Fertile Ground; C) Vertical Marking; D) Steel Bridge Protective Barriers. 6) Geodetic Service - As -Built Inventory. The Contracting Authority Requires The Contractor To Set A Geodetic Line Before Entering The Road Lane. In Order To Properly Perform The Subject Of The Contract. 7) A Detailed Scope Of Work (Description Of The Subject Of The Contract) Was Contained In The Technical Documentation, The Daily Works Supplementing The Documentation And In The Technical Specifications Of The Execution And Receipt Of Works Constituting Attachments To Swz. In The Price Calculation Of The Offer, The Contractor Should Take Into Account All The Requirements And Conditions Required To Properly Perform The Subject Of The Contract; 8) As Part Of The Contract, The Contractor Is Also Obliged To: A) The Organization And Development Of The Construction Facilities; B) Providing Ongoing Geodetic Service By Authorized Geodetic Services, Performing As -Built Documentation, Including Geodetic Documentation (As -Built Inventory) Of All Works, Approved By Appropriate, Due To The Location Of The Works Of The Office Of Geodesy And Cartography; C) Developing A Safety And Health Protection Plan If Required; D) Marking The Construction Site; Damage When Conducting Works - Repairing Them And Bri
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.