1) The Subject Of The Study Is The Renovation Of The Fields At The School Complex In Moryń On Plots 62 And 63/4 Moryń In Moryń 1 At Dworcowa Street. This Project Has Been Developed For The Renovation Of Existing Fields, Treadmills And Long -Jumping On The Distance 2) In Accordance With The Scope Of The Study And The Arrangements With The Investor, The Renovation Covers: - Basketball Court With Polyurethane Surface - Re -Pavement Surface Of Polyurethane Surfaces Such As Spray Surfaces, And Local Supplementation Of Damaged Surfaces. The Pitch Has An Area Of About 567 Rn2. Attention! Detailed Surface Renovation Solutions According To The Manufacturers Guidelines And Drawing Details. Detailed Arrangement Of The Line On The Pitch After Agreeing With The Investor. - Volleyball Court With Synthetic Grass - It Is Designed To Disassemble The Existing Surface Along With Utilization, Density Of The Existing Foundation Along With The Completion I Had A Stone And A New Surface Of Synthetic Grass. The Pitch Has An Area Of About 218 Rn2. Attention! Detailed Surface Renovation Solutions According To The Manufacturers Guidelines And Drawing Details. Detailed Arrangement Of The Line On The Pitch After Agreeing With The Investor. - Treadmill With Polyurethane Surface - A Spray -Type Polyurethane Surface Is Designed, And A Local Supplement To The Damaged Surface. The Treadmill Has An Area Of About 1295 Rn2. Attention! Detailed Surface Renovation Solutions According To The Manufacturers Guidelines And Drawing Details. Detailed Arrangement Of The Line On The Pitch After Agreeing With The Investor. The Treadmill Has An Area Of About 73.20 Rn2. Attention! Detailed Surface Renovation Solutions According To The Manufacturers Guidelines And Drawing Details. Detailed Arrangement Of The Line On The Pitch After Agreeing With The Investor. - Multifunctional Pitch With Synthetic Grass - Disassembly Of The Existing Surface With Utilization, Density Of The Existing Foundation Along With The Completion Was Stone And A New Surface Of Synthetic Grass. The Pitch Has An Area Of About 928.2 Rn2. Attention! Detailed Surface Renovation Solutions According To The Manufacturers Guidelines And Drawing Details. Detailed Arrangement Of The Line On The Pitch After Agreeing With The Investor3) The Detailed Scope Of Work Is In The Technical Description, Technical Specifications Of The Execution And Acceptance Of Works And The Prejudice Of The Works.4) Due To The Impossible To Determine The Area Of Polyurethane Pavement Which Requires A Local Completion, The Contracting Authority Assumed That This Quantity Should Not Be More Than 10 % Of Each Pitch From Polyurethane Surface. This Item Will Be Settled According To The Actually Made Quantity On The Basis Of As -Built Measurement. 5) During The Implementation Of The Subject Of The Contract, The Contractor Is Immediately Required To Inform The Employer About Special, Probable, Not Only About Current, But Also About Future Events Or Circum
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.