During High-Quality Painting, Third Spatility Of Stacking Structures, On The Third Spatlist Of Surfaces, On Wooden Surfaces: Walls, Plastering With Cement-Lime Or Cement Mortar Of Concrete And Stone Surfaces: Walls, Improved, Brick Walls And Ceilings From Surfaces Of Plaster, Adding Or Exit To 27-06-020-3 When The Thickness Of The Cover Is 0.5 Cm (Extra 1 Cm), Establishment Of A Thickly Large-Grained Eu-Grainy Boiling Boiling Thickness Of 4 Cm Cover, Density Of Stone Materials: 2.5-2.9 T / M3, Configuring Soil In The First Walk On A Trace With 8 T-Luced Trailing Trailing, Thickness Of The Layer: 20 Cm, Construction Of Core And Coatings From Sand-Gravel Or Broken Sand Mixtures: S-4 And S-6 Continuous Granulometric, Thickness Of 15 Cm, Asphaltbeton Pavement Covers With A Thickness Of 4 Cm With The Help Of Pneumatic Temptations, Construction Of A Water-Dispersed Liner: To A Porous Surface (Stone, Brick, Concrete, Etc.), Cleaning Of The Area From The Garbage, Construction Of Six Bases: Gravel, Demolition Of Concrete-Based Board Stones, Correction Of Reaching Rooms: Gravelly
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.