GTR 96321063

Tenders Are Invited For Heating, Ventilation And Air Conditioning Installation Work -Ventilation -Related Systems -New Construction Of The Training Workshop Sewage Treatment Plant Dinslaken

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
96321063
Tendering Authority
Subscribe to view
Tender No
297429-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Heating, Ventilation And Air Conditioning Installation Work -Ventilation -Related Systems -New Construction Of The Training Workshop Sewage Treatment Plant Dinslaken
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
10-06-2025 Closed
Work Detail
Heating, Ventilation And Air Conditioning Installation Work -Ventilation -Related Systems -New Construction Of The Training Workshop Sewage Treatment Plant Dinslaken. On The Site Of The Sewage Treatment Plant, The Establishment Of A Single -Storey Training Workshop For The Training Occupations Is Planned For Mechatronics, Electronics Technicians And Industrial Mechanics. Kg 431 - Ventilation Systems Rlt System 1 - V = 9,200 M³/H The Building Is Supplied Via A Ventilation Compact System Set Up On The Roof. All Necessary Rooms, With The Exception Of The Hallway, Are Ventilated And Vented Via This System. It Has Heat Recovery (84%) With Rotary Heat Exchanger And Energy -Efficient Fan Technology, As Well As The Air Treatment: Filtering, Heating, Cooling And Moistening. The Ventilation Compact System And The Cold Water Set (Heating/Climate Trade) Are Arranged Together With The Isp02 (Msr Trade) In A Privacy Screen On The Roof. The Air Duct System Is Made Of Galvanized Steel. The Route Distribution (Supply And Exhaust Air) Takes Place On The Roof. The Industrial Meadow Development Is Distributed Over The Slope Ceilings. The Air Canal Network Of The Supply And Exhaust Air Inside And Outside The Building Is 100% Covered With Thermal Insulation. Surface Protection Made Of Sheet Steel Must Be Provided In The Outdoor Area And In Areas At Risk. If Components (Walls And Ceilings) Classified In Terms Of Fire Protection, Fire Protection Flaps Must Be Arranged. Volume Current Rule And Controllable Air Inputs And Regulations Are Arranged For Controlling And Regulation Rlt System 1. Depending On The Requirement, Co2-Dependent Or Moisture-Dependent Room Regulations Are Carried Out Using The Control Technology. Torlufmereir Facilities - 10,800 - 14,300 M³/H The Workshop Has A Gate Entrance, On Which Two Air Veils Can Be Arranged. These Work Exclusively With The Pre -Conditioned Indoor Air, Without Additional Temperature. The Flap Is Via Pressure Chamber Nozzles That Can Be Rotated. The System Is Controlled By Opening And Closing The Roller Gate. Suction System - 6,000 M³/H In The Workshop There Are Two Sweat And Various Soldering Arena, The Vapors Of Which Are Sucked Out At The Workplace And Cleaned Via A Smoke Filter. The System Works In The Recirculation Principle. In The Range Of Orders, The System Must Be Created Including The Main Collecting Pipes. The Ag Builds The Workplace Connections On Its Own.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0e1ea439-7515-4375-9aa5-2475eaf6f8b5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders