Part 1 Of The Subject Of The Order Reconstruction Of Municipal Road No. 114152E And 114053E On The Section Ostrów - Rybnik Reconstruction Of Municipal Road No. 114152E And 114053E On The Section Ostrów - Rybnik With A Total Length Of Approx. 2540 Mb (Journal Of Laws No. 307 Ostrów Geod. Broken Down Into 2 Stages, I.E.: And The Stage With A Length Of Approx. 1300 Mb (From The Poviat Road In M Ostrów In Rybnik) Ii Stage (From The End Of The First Stage To The Town Of Rybnik With A Length Of About 1240 Mb) In The Scope Of The Work Of The Reconstruction Will Include The Implementation Of The New Foundation (Depending On The Needs), The Bituminous Road With A Min. 5.0 M; Shoulders; Drainage, Renovation/ Reconstruction Of Road Culverts, Technological Channel Or Deviation From Its Construction, Modernization Of Street Lighting (Assembly Of Led Lamps), Conventions, A Permanent Traffic Organization Project, Inclusion To The Poviat Road, Developing An Information Card Of The Project Along With Obtaining An Environmental, Location, Etc., Removal Of Collision With Road Works And Other Works Arising From Project Arrangements Necessary Consent From Landowners Not Owned By The Commune. , As Well As Projects Of Possible Reconstruction Of Infrastructure Elements Of Other Intervals With The Designed Road, As Well As Other Necessary Development (E.G. Water And Legal Storage With A Water And Legal Decision), F) Technical Specifications For The Implementation Of Construction Works, G) Safety And Health Protection Plan, H) Project Of A Permanent Traffic Organization (Approved), I) Premier Works, J) Investor Cost Estimate. The Provider Is Obliged To Obtain All Necessary Documents, Opinions, Arrangements, And Obtaining A Decision - Permission To Build / Notify Construction Works Without Requiring Permission For Construction Works / Notification Of Construction Works. Construction For This Task. The Contractor Will Obtain The Above Documents Acting On The Basis Of A Power Of Attorney Granted By The Employer. Possible Costs Of Obtaining Documents (Including Fees For Issuing Arrangements, Administrative Fees, Etc.) Are On The Contractors Side. As Part Of The Contract, The Contractor Will Supervise Authors Supervision.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.