The Assignment Was Shaped In A 2-Phase Contract, Consisting Of A Construction Team Agreement And A Realization Agreement. The Assignment Consists Of (1) Participating In The Construction Team To Arrive At A Realizable Design Or Cutlery. The Contractor In The Construction Team May Excluding A Price Offer For The Results Of The Construction Team. If Og And On Agreement On The Price Offer Of The Contractor, A (2) Realization Agreement Can Be Concluded And To Implement On The Basis Thereof. Activities Phase 1: Uo-Engineering Temporary Auxiliary Constructions, Formwork And Support Censing, Handrailing And Weir Valves; Drawing Up The Work Plans; Doing A Final Price Offer Based On A Review Of The Offer. Phase 2 Activities: Realizing 2 Valve Style With Dental Lifts Including Gradual Transitions Towards The Watercourses; Application Quays Towards The Weirs From The Hooiweg; Application Soil And Bank Protection; Extend The Valve Existing Maze Weir; Raising Quays Around The Maze; Work Arising From The Construction Team Including The Performance Of Additional Activities;
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.