Electronic Tool For Submitting Bids (And For Communication According To The Zzvz § 211): Https://Nen.Nipez.Cz/Profil/Dobrikov The Offer Of Offers Will Only Be Done Via Nen! Here: Https://Nen.Nipez.Cz/Verejne-Zakazky/Detail-Zakazky/N006-25-V00013508 The Subject Of The Public Contract Is Construction Work. The Repair Of The Roof Structure And The Installation Of Classrooms To The Attic Will Be Carried Out On The Premises Of The Elementary School In Dobříkov. The Part Of The Roof Structure Remains The Existing Saddle With A Slope Of 37 ° And The Maximum Ridge Height +14.330 M. In The Back Tract Of The Primary School Above The Staircase, A New Roof Gap With A Slope Of 37 ° And The Ridge Height +14.330 M, Connecting To The Existing Roof Structure. Vertical Brick Structure Made Of Ceramic Blocks Thickness. 440 Mm And 300 Mm, Partitions From Sdk Th. 200 Mm And 100 Mm. On The 2Nd Floor, A New Staircase Will Be Made In The Existing Staircase In The Attic Installation, The Existing Staircase Will Be Canceled. New Horizontal Load -Bearing Structures - Part Of The Floor In The Attic Of Reinforced Concrete Prestressed Panels Thickness. 200 Mm, Construction Of The Ceiling Of The Soil Built -In From The Insulated Sdk Suspended Under The Roof Of The Roof. Facade Made Of Thin -Layer Silicate Plaster Of Grain Size 1.5 Mm Maintaining The Existing Color Of The Facade, Roofing Of Burnt Tile Red, Wooden Glazed Windows With Insulating Triple Glazing. Layout Solutions: Corridor With Staircase, Cleaning Chamber, Hallway, Toilet Boys, Toilet Girls, Cabinet, Warehouse Aids, Computer Room, School Club, Classroom Of Special Education And Warehouse Aids. The Contracting Authority Strives To Obtain A Subsidy From The Sef Or Mrd. At The Time Of The Selection Procedure, It Is Not Yet Known Whether The Contract Will Be Subsidized And From What Subsidy Sources. The Supplier Acknowledges That In The Case Of Obtaining Subsidy Support, It Undertakes To Deliver The Necessary Documents To Obtain The Subsidy Or Proper Settlement Of The Subsidy At The Request Of The Contracting Authority. For Example, A Waste Use Report (See Article 6 Zd). The Contracting Authority Warns The Supplier That Offers Can Only Be Submitted In Writing In An Electronic Form Through A National Electronic Instrument.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.