Local Administration, Architectural And Posterior Project, Structural Design (Masonry, Coverage And Ladder) And Subsequent Built, Electrical Design And Telecommunication And Posterior Built (With Descriptive Memorial And Detailed List Of Materials), Hydrosanitary Design And Posterior Built (With Descriptive Memorial And Detailed List Of Materials), 07/05/2025, Ppci Approved By The Ppci Approved Firefighters, Supply And Installation Of Work Plate With Galvanized Plate And Wood Structure. Af 03/2022 Ps, Container Rental 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Not Inclusive/Demobilization), Handling Of Wood For Coverage, Without Reuse - Replacement With Inspection Evaluating, Up To 20%, Glowing And Ruffles, Without Reusing, Without Reuse Removal Of Tiles, Fiber Cement, Metal And Ceramic, Without Reuse., Replacement Of Wood Plot Composed Of Tuesdays Up To 2 Water For Wavy Tile Of Fiber Cement, Metallic, Plastic Or Thermoacoustic, Up To 20% After Assessment Of Surveillance, Roof With Colonial Cape, Up To 2 Waters, Included Transportation Vertical., Cumerate For Ceramic Tile Plocked With Stroke 1: 2: 9 (Cement, Lime And Sand) To Roofs Up To 2 Water, Included Vertical Transport, External/Internal In External Steel Slate Number 26, 33 Cm Cut, Lifting Rainflower. Galvanized, Cut 33, Surface Waterproofing With Asphalt Blanket, A Layer, Including Asphalt Primer Application, E = 3Mm. Af_06/2018, Drywall Sheet Removal And Profiles, Partition Disassembly (With Or Without Windows), Drywall Plocked Plaster Wall, Internal Use, With Acoustic Glass Isolation 50 Mm, With Two Simple Faces And Metallic Structure With Simple Liquid Guides With 6 M2 Or Equal To Walls, With. Ceramic Block Masonry Vertical Vertical Of 14X19x39cm (14Cm Thickness) And Concrete Concrete -Molded Concrete -Molded Concrete On -Site Concrete On Loco, Fastening (Courouns) Expansive Polyurethane Foam Sealing. Af_03/2016, Demolition Of Ceramic Coating, Without Reuse - Floor - After Evaluation Of The 1St Floor By Inspection, Careful Removal Of Dishes, For Reuse, Installation Of Conventional Toilet With White Dishes - Renovation, Ceramic Footer Demolition, Retrace -Clad Counteraput 1: 4 (Cement And Sand), Mechanical Preparation With Betonier 400 L, Applied In Areas Droughts On Slab, Adhered, Finish Not Reinforced, Thickness 2Cm. Af_07/2021, Not Adhered To, Thickness 6Cm - Outdoor Area 1St Floor, Ceramic Flooring With Porcelain Tiles Of Dimensions 45X45 Cm Applied In Environments Of Area Between 5 M² And 10 M² - Rooms, Ceramic Flooring With Porcelain Tiles Of Dimensions 45X45 Cm Applied In Environments Of Area Greater Than 10 M² - Areas Common Internal And External (After Evaluation Of The 1St Floor By Inspection), 7Cm High Ceramic Footer With Extra Extra Dimensions 45X45cm, Mechanized Linear Dimensions In Contrast, For The Installations/ Distribution Of Installations