Tenders Are Invited For Architectural, Engineering And Planning Services - Ecological Upgrading And Improving The Flood Protection Of The Erm In Neckartenzlingen
Tenders Are Invited For Architectural, Engineering And Planning Services - Ecological Upgrading And Improving The Flood Protection Of The Erm In Neckartenzlingen
Architectural, Engineering And Planning Services - Ecological Upgrading And Improving The Flood Protection Of The Erm In Neckartenzlingen. The Scope Of Services Of The Planning Services To Be Awarded Is Divided Into The Following Partial Services And Levels: Post. 1) Object Planning - Outlashes Pos. 1.1) Basic Services According To § 39 Hoai Pos. 1.1.1) Performance Phases 1 To 4 (Level 1) Pos. 1.1.2) Option: Performance Phases 5 To 9 (Level 2) Pos. Performance Phases 1 To 4 (Level 1) Pos. 2.1.2) Option: Power Phases 5 To 9 (Level 2) Pos. 3) Option: Surveying Post. 3.1) Option: Planning -Accompanying Measurement (Level 1) Post. 3.2). Option: Special Performance Construction Measurement (Level 2) Pos. 4) Option: Geotechnik Pos. 4.1) Create An Lv For The Tender Of The Geotechnical Items 5) Hydraulic Calculations (2D, Inpatient, Wsp Lay) (Level 1) Post. 5.1) Ist Call Pos. 5.1.4) Documentation, Interim Report Item 5) Planning Status Pos. 5.2.1) Building 2D Model Pos. 5.2.2) Calibration Post. 5.2.3) Hydr. Calculations Pos. 5.2.4) Documentation, Final Report And Plans Pos. 6) Option: Entertainment Planning After Completion Of The Measure (Level 2) Pos. 7) Environmental Planning (Level 1) Pos. 7.1) Environmental Impact Preliminary Examination According To The Uvpg Pos. 7.2) Maps Of Flora And Fauna Incl. Report And Map Of Items 7.3) Species Protection Law Compatibility (Sap) Pos. 7.4) Extraution Application Landscape Protection Area Post. 7.5) Lbp N. § 26 Hoai With Intervention And Compensatory Accounting Including Maps Item 8.) Option: Professional Support In Public Relations Of The Ag. Here: Dates Of The Early Public Participation (Level 1) Pos. 8.2) Option: Technical Support In Public Relations Of The Ag. Here: Dates Of The Early Public Participation (Level 2) Pos. 8.3) Option: Dates Up To 4 Hours (Online), Which Are Not Covered Via The Above Positions. Pos. 8.4) Option: Dates Up To 4 Hours (At Ag), Which Are Not Covered By The Above Item. Pos. 8.5) Option: On -Site Dates Up To 4 Hours And Item 8.6) Option: On -Site Dates Up To 8 Hours That Are Not Covered By The Above. The Order Applies To The Order: A) Conclusion Of The Contract And The Start Of The Service Vsl. 03.11.2025. B) Completion Op Lp 3, Planning Accompanying, Mapping Until 31.07.2026 (Duration Approx. 9 Months). C) Completion Op Lp 4 And Other Environmental Planning Services Until 31.10.2026 (Duration By The End Of Lp 4 Approx. 12 Months). D) Completion Lp 5-8 And Acceptance Construction Work 31.05.2027 (Of Which Construction Time Approx. 14. Months). E) Lp 9 Until The Expiry Of Warranty Claims, Vsl. 31.05.2032. These Appointments Will Be Part Of The Contract In The Order Case, Provided That The Ag Does Not Communicate A Amended Appointment Specifications In The Procedure (E.G. Postponement Of Service Without The Overall Term). Immediately After The Start Of Performance, The Contractor Must Be Drawn Up A Corresponding Schedule For The Implementation In The Draft And Coordinated With The Ag, Which This T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.