The Material Scope Of The Subject Of The Contract Includes The Construction Of An Internal Power Network And Video Monitoring At The Ethnographic Museum In Zielona Góra - Ochla And The Execution Of Construction Works To The Full Extent And Carrying Out All Necessary Acceptance In Order To Obtain A Permit For Use. Ochla-Muzena 5, Plot No. 120/2, 120/3 132/5, 39, 40, 47, 923, 925, 948 (086201_1 M. Zielona Góra, Precinct 0047-Ochla). The Work Must Take Into Account The Possibility Of Simultaneous Construction Works And The Museums Work. The Work Of Works (Works) And The Manner Of Their Implementation (Execution) Contains A Description Of The Subject Of The Contract (Opz) - Construction Documentation, Constituting Annex 9A To Swz (Electrician) And 9B To Swz (Monitoring), Including The Annex Specification Cctv. 2.1. System Assumptions Are Mistakenly Stated That The Image Storage For 14 Days Is Assumed For The System, While The Record Should Be Correctly: For The System, The Image Storage For 14 Days Is Assumed. The Experience Will Give For Use The Subject Of The Contract In Free From Defects And Faults, And Provides All Documentation Of Built -In Materials, Confirmation Of Work In Accordance With The Provisions Generally Applicable To A Given Type Of Facilities. The Contracting Authority Requires Works In The Conditions Of An Active Object In Which Museum Activities Will Be Carried Out. The Facility Will Be Available For Visitors, Including Children During The Implementation Period. Considering The Above, It Is Required That The Works Are Carried Out In Stages, On The Basis Of The Accepted Monthly Work Schedule (Which With The Consent Of The Ordering Party May Be Subject To Modifications). Excavations Should Be Properly Secured And Supervised By The Contractor. Monthly Material And Financial Schedules Of The Task Must Take Into Account The Calendar Of Cultural Events And Cannot Hinder Their Implementation. The Schedules Are Subject To Acceptance Of The Employer, And In The Scope Of Technical Also Investor Supervision. The Employer Requires The Nn Cable Line And The Technical Canal Of Video Monitoring. Conducting A Common Excavation. The Works Of Works And The Transfer Of The Construction Site Is Planned For June 2025, I.E. After Obtaining A Final Building Permit. The Contractor Is Obliged To Agree With The Investor The Colors Of Electrical Cabinets And Other Elements. In The Case Of When The Subject Of The Contract Is Described By Reference To Standards, European Technical Assessments, Approval, Technical Specifications And Technical Reference Systems, The Contracting Authority Allows The Equivalent Solutions. Wherever Such Elements Have Been Indicated, The Use Of The Phrase Or Equivalent Should Be Imposed. If The Description Of The Subject Of The Contract Has Own Names Or Trademarks, They Should Be Treated Only As An Example That Exactly Corresponds To The Description Of The Subject Of The Contract. The Employer At The Same Time Notes That The Use Of
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.