.) Differential Earthworks For Constitution Of The Basin; .) Profiling Of Natural Banks; .) The Construction Of A Retaining Wall (With Gabions Facing) On The Sides Along The Concrete Path; .) The Realization Of The Input And Exit Works Of The Waters Of The Basin; .) Anti-Erosive Riprap In The Background And Bank In The Places At The Entrance Of The Waters; .) The Access Staircase In The Pool; .) Securing Fences And Barrier Access To The Structure; .) The Redevelopment Of The Surroundings; .) Etc. - The Rejection Of Water Downstream Of The Site In The Sewer Existing Under The N3, Including Fitting Out Of An Existing Visit Chamber; - General Profiling Of The Shoulders; - The Construction Of A Vegetable Merlon (Height 150Cm) On The Southwest Edge Of The Site; - And...
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.