Ventilation Installation Work-H95 Kinderhaus Konrad-Adenauer-Straße 35-Ventilation Installation. The New Construction Of A 5-Group Daycare Center With Underground Car Park And Outbuildings Is To Be Built At Konrad-Adenauer-Straße 35, 85221 Dachau Next To An Existing Daycare Center. The Power Includes: 1 Pc Central Testing Device With Wrg And Adiabatics 11,000 M³/H 1 Pc. And 1 Hours Of Exhaust Air System For Kitchen Ventilation With Accessories Approx. 28 M² Kitchen Ventilation Ceiling Approx. 110 Pc Air Outlets Approx. 860 M² Ventilation Channels Including Insulation Approx. 250 M Of Folding Pipes Approx. 170 Piped Volume Control, Sound Protection Valves, Fire Protection Valves Or Other Components 1 St. Msr Technology For Ventilation And Heating System Including Management Level
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.