Tenders Are Invited For Repair Of The Roof Covering Of The 6 Kv Rp6/23 Switchgear Together With The Transformer Chambers Located At The North Ventilation Glass For The Restructuring Company Of Minets S.A. Czok Ward.
Tenders Are Invited For Repair Of The Roof Covering Of The 6 Kv Rp6/23 Switchgear Together With The Transformer Chambers Located At The North Ventilation Glass For The Restructuring Company Of Minets S.A. Czok Ward.
1. The Material Scope Of The Order Includes: The Material Scope Of The Order Includes: Renovation Of The Roof Of The 6 Kv Rp6/23 Switchgear Building For The Makoszowy Pumping Station, Including: A. Develop A Safe Performance Instructions And The Bioz Plan Together With The Inventory Of The Roof Roof And Obtain The Approval Of The Department Of The Czok Branch In Czeladz, B. Develop A Project Of Technology And Organization Of Works And Approve The Czok, C Plant. Clear Trees At The Facade Of The Switchgear Colliding With Renovation Works, D. Installation And Disassembly Of Scaffolding And Assume The Costs Of Labor And Assembly Of Scaffolding, Fencing Hazardous Communication Zones, Etc. And Any Labor Costs Of Equipment Units, I.E. Crane, Increase, Lift And Transport. E. Remove The Lightning Protection System, F. Remove The Old Roofing From The Roof Of The Switchgear Building, G. Dismantle The Tinsmith Processing As Well As Gutters And Downpipes, H. Repair The Roof Structure And Profile The Decreases Before The Roof Covering Is Replaced, I. Przeglown, Fire Walls And Complement Plasters On Fire Walls And Chimneys. Make Reinforced Concrete Chimney Hats, K. Replacement Of Locking Roof Processing And Chimney Caps, L. Protect The Existing Fans, Perform Anti -Corrosion Protection Of Steel Elements And Perform Their Re -Installation To Newly Made Chimney Hats With Their Power Supply, Make Anti -Corrosive Painting Of Input Ladders N. Purchase And Delivery Of All Necessary Materials For The Abovementioned Tasks, Fr. Make 2 Layers Of Heat -Seal Roofing Felt With A Glass Fiber Veil With A Minimum Thickness Of 4.0 Mm And Thermoscosis Papa With A 5.2 Mm Thick Fiber -Thick Fiber Veil With A Glass Fiber Veil Install New Tinsmiths As Well As Gutters And Downpipes .Q. Install A New Lightning Protection System, R. As -Built Measurements Of The Lightning Protection System. Ordering The Area With The Transmission Of Materials From The Work Of Dismantling Papa And Gruz.T. Complete Receiving Documentation. The Concise Range Of Construction Works Is Determined By The Documents Required In Accordance With § 4 Of The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specifications Of The Execution And Acceptance Of Construction Works As Well As The Functional And Utility Program Constituting Annex 7 To Swz. The Bill Of Quantities Constituting Annex 8 To Swz Does Not Constitute A Description Of The Subject Of The Contract And Is Non -Binding, I.E. Only Informative. The Contractor Receives These Materials Only For Auxiliary Purposes For The Purposes Of Calculating The Price Of The Offer. The Basis For The Settlement Of Works With The Contractor Is A Flat -Rate Remuneration. The Above May Have Discrepancies Between The Quantity And Scope Of The Work Shown In The Attached Prejudice Of Works And The Quantity And Scope Of Work To Perform Resulting From Documents Making Up The Description
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.