GTR 96225320

Quotation Are Invited For Assessing Instrument Air System

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
96225320
Tendering Authority
Subscribe to view
Tender No
2332501105
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Assessing Instrument Air System
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
08-05-2025 Closed
Work Detail
Quotation are invited for Assessing Instrument Air System a Comprehensive over View Introduction the Purpose of this Document is to Outline. SCOPE OF WORK FOR ASSESSING INSTRUMENT AIR SYSTEMA COMPREHENSIVE OVERVIEWINTRODUCTIONTHE PURPOSE OF THIS DOCUMENT IS TO OUTLINE THE SCOPE OF WORK REQUIREDFOR A COMPREHENSIVE ASSESSMENT OF THE INSTRUMENT AIR SYSTEM. THIS SYSTEMIS CRITICAL FOR THE PROPER FUNCTIONING OF VARIOUS INSTRUMENTS ANDCONTROLS WITHIN INDUSTRIAL FACILITIES.OBJECTIVES·#TO EVALUATE THE CURRENT PERFORMANCE AND RELIABILITY OF THE INSTRUMENTAIR SYSTEM.·#TO IDENTIFY POTENTIAL AREAS OF IMPROVEMENT AND OPTIMIZATION.·#TO ENSURE COMPLIANCE WITH RELEVANT STANDARD S AND REGULATIONS.. TO RESOLVE INSTRUMENT AIR PRESSURE MAINTAINING LESS PRESSURE THANREQUIRED.SCOPE OF WORK1. INITIAL REVIEW AND D ATA COLLECTION·#COLLECT AND REVIEW EXISTING DOCUMENTATION AND DRAWINGS RELATED TO THEINSTRUMENT AIR SYSTEM.·#GATHER OPERATIONAL DATA , INCLUDING PRESSURE, FLOW RATES, ANDEQUIPMENT PERFORMANCE METRICS.·#IDENTIFY ANY HISTORICAL ISSUES OR RECURRING PROBLEMS WITH THE S YSTEM.2. SITE INSPECTION AND ASSESSMENT·#CONDUCT A THOROUGH SITE INSPECTION OF THE INSTRUMENT AIR SYSTEM,INCLUDING COMPRESSORS, DRYE RS, FILTERS, AND DISTRIBUTION LINES.·#ASSESS THE PHYSICAL CONDITION OF ALL COMPONENTS AND IDENTIFY ANYSIGNS OF WEAR, CORROSION, LEAK AGES OR DAMAGE.·#EVALUATE THE INSTRUMENT AIR SYSTEM LAYOUT AND CONFIGURATION FOREFFICIENCY AND EFFECTIVENESS.3. PERFORMANCE TESTING AND ANALYSIS·#PERFORM PERFORMANCE TESTS TO MEASURE KEY PARAMETERS SUCH AS HEADERPRESSURE STABILITY, AIR QUALITY, COMPRESSOR PERFORMA NCE AND ENERGYCONSUMPTION.·#ANALYZE TEST RESULTS TO DETERMINE THE SYSTEMS CURRENT PERFORMANCELEVELS AND IDENTIFY ANY DEVIATIONS FRO M EXPECTED STANDARDS.·#COMPARE THE PERFORMANCE DATA WITH INDUSTRY BENCHMARKS AND BESTPRACTICES.4. IDENTIFICATION OF ISSUES AND RECOM MENDATIONS·#IDENTIFY CURRENT ISSUES OR DEFICIENCIES IN THE INSTRUMENT AIR SYSTEM,INCLUDING EQUIPMENT FAILURES, LEAKS, OR INEFFICIENC IES. SOME OF THEM AREAS BELOWA) REQUIRED INSTRUMENT AIR HEADER PRESSURE IS NOT MAINTAINING.B) DRYER SIZING CONFIRMATION.C)ALL 04 NO S COMPRESSORS ARE IN LOADING CONDITION TO MAINTAIN HEADERPRESSURE, THOUGH THEY ARE DESIGNED FOR 3X50%,ETC.·#PROVIDE DETAILED RECOMME NDATIONS FOR CORRECTIVE ACTIONS ANDIMPROVEMENTS, INCLUDING POTENTIAL UPGRADES OR REPLACEMENTS.·#PRIORITIZE RECOMMENDATIONS BASED ON THEIR IMPACT ON SYSTEMPERFORMANCE AND RELIABILITY.5. COMPLIANCE REVIEW·#REVIEW THE INSTRUMENT AIR SYSTEMS COMPLIANCE WITH RELEVANT STANDARDSAND REGULATIONS, SUCH AS ISO 8573 FOR COMPRESSED AIR QUALITY.·#IDENTIFY ANY NON-COMPLIANCE ISSUES AND PROVIDE RECOMMENDATIO NS FORACHIEVING COMPLIANCE.6. REPORTING AND DOCUMENTATION·#PREPARE A COMPREHENSIVE ASSESSMENT REPORT DETAILING THE FINDINGS,ANALYSIS , AND RECOMMENDATIONS.·#INCLUDE ALL RELEVANT DATA, TEST RESULTS, AND SUPPORTINGDOCUMENTATION.·#PROVIDE A CLEAR ACTION PLAN FOR IMPLE MENTING THE RECOMMENDEDIMPROVEMENTS.DELIVERABLES·#I NITIAL REVIEW AND DATA COLLECTION SUMMARY.·#SITE INSPECTION AND ASSESSMENT REPORT .·#PERFORMANCE TEST RESULTS AND ANALYSIS.·#RECOMMENDATIONS FOR IMPROVEMENTS AND COMPLIANCE ACTIONS.·#COMPREHENSIVE FINAL ASSESSMENT REPORT.TIMELINETHE ASSESSMENT PROCESS IS EXPECTED TO TAKE APPROXIMATELY 2 TO 3 WEEKS,DEPENDING ON THE COMPLEXITY OF THE SYSTEM AND T HE AVAILABILITY OF DATA.CONCLUSIONCONDUCTING A THOROUGH ASSESSMENT OF THE COMPRESSED INSTRUMENT AIR SYSTEMIS ESSENTIAL FOR ENSURING ITS OPTIMAL PERFORMANCE AND RELIABILITY. THEFINDINGS AND RECOMMENDATIONS FROM THIS ASSESSMENT WILL PROVIDE VALUABLEINSIGHTS FOR MAIN TAINING AND IMPROVING THE SYSTEM, ULTIMATELYCONTRIBUTING TO THE OVERALL EFFICIENCY AND SAFETY OF THE FACILITY.FOR DETAILS, CONTACT:H AJI ABDULLAH,MOB NO-0526970925,[email protected] Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501105)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2fd33378-dd56-425e-b450-1f4895df33b4.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you