1. The Subject Of The Order Is The Construction Of The Park & Ride Car Park In Górno In The Design And Build Formula A) As Part Of The Task Designed And The Following Elements Will Be Performed:- Parking For Passenger Cars, Including Places For People With Disabilities, Along With Parking Spaces For Motorcycles / Scooters- With Accompanying Infrastructure- Dehydration, Lighting, Designed For Blowing Up And For Passengers,- Waiting Room With Internal Installations: Water And Sewage, Central Heating, Air Conditioning, Mechanical Ventilation, Electrical, Lighting, Monitoring, Together With The Necessary Infrastructure And Energy-Saving Lighting Supported By Electricity From Photovoltaic Panels,- Water And Sewage Connections, Electrical, Pedestrians And Cyclists With The Possibility Of Installing Photovoltaic Panels, Bicycle Racks, Benches, Garbage Bins,- Self-Service Bicycle Repair Point,- Hardening Of The Area, Including An Access Road To The Designed Parking Lot Together With The Connection Of This Road With An Existing Communication System,- Playground,- Active Pedestrian Crossing Within The Provincial Road 752,- Vertical And Vertical Marking Horizontal.B) Planned Arrangement Of The Development Of The Investment Area Was Presented In The Pfu-01 Situation Plan. Design And Construction Works. 1.1. The Contractor Is Obliged To:- Develop Project Documentation Together With Obtaining A Building Permit Required By Law,- Implementation Of Construction Works. 1.2. The Project Includes The Design And Implementation (Along With Obtaining All Necessary Decisions, Permits, Arrangements) Of The Following Elements:- Parking For Passenger Cars, Including Places For People With Disabilities, Along With Parking Spaces For Motorcycles / Scooters- With Accompanying Infrastructure- Dehydration, Lighting,- Bays For Passenger Vehicles Designed For Blowing Up, And For Pashors, Waiting Room With Internal Installations: Water-Sewage, Central Heating, Air Conditioning, Mechanical, Electrical, Lighting, Monitoring, Together With The Necessary Infrastructure And Energy-Saving Lighting Supported By Electricity From Photovoltaic Panels,- Water And Sewage Connections, Electrical Connections,- Elements Of Small Architecture- Shelter For Pedestrians And Bikes Photovoltaic, Bicycle Racks, Benches, Garbage Bins,- Self-Service Bicycle Repair Point,- Hardening Of The Area, Including An Access Road To The Designed Parking Lot Together With A Connection Of This Road With An Existing Communication System,- Playground,- Active Pedestrian Crossing Along The Provincial Road 752,- Vertical And Horizontal Marking. The Contractor Undertakes To Perform All The Works Described In Documentation, Including The Functional And Use Program, Construction Works Necessary To Implement The Subject Of The Contract. The Execution Of Construction Works That Have Not Been Specified In The Preface Of Works And Are Necessary To Perform The Subject Of The Contract In Accordance With The Documentation Does N