1 For Blowing Up And Boarding Passengers,- Waiting Room Together With Internal Installations: Water And Sewage, Central Heating, Air Conditioning, Mechanical Ventilation, Electrical, Lighting, Monitoring, Together With The Necessary Infrastructure And Energy-Saving Lighting Supported By Electricity From Photovoltaic Panels,- Water And Sewage Connections, Electrical,- Elements Of Small Architecture Benches With The Possibility Of Installing Photovoltaic Panels, Benches, Garbage Bins,- Two Sheds For Bicycles,- Self-Service Bicycle Repair Point,- Vertical And Horizontal Marking,- An Active Pedestrian Crossing Along The Poviat Road 1308T (Cedzyna- Leszczyny) Along With The Pavement On The Section From The Pedestrian Crossing To Plot No. 802/68.B) The Planned Arrangement Of The Development Of The Investment Area Was Presented In The Figure Pfu-01 Situational Plan .C) This Functional And Utility Program Is The Basis For:- Preparation Of The Tender Offer By The Contractor,- Conducting The Procedure For Selecting The Contractor In The Formula Design And Build, Under The Public Procurement Law,- Conclusion Of The Contract With The Contractor For The Implementation Of The Design Document Construction.1.1. The Contractor Is Obliged To:- Develop Project Documentation Together With Obtaining A Building Permit Required By Law,- Implementation Of Construction Works. 1.2. The Project Includes The Design And Implementation (Along With Obtaining All Necessary Decisions, Permits, Arrangements) Of The Following Elements:- Parking For Passenger Cars, Including Places For People With Disabilities, Along With Parking Spaces For Motorcycles / Scooters- With Accompanying Infrastructure- Dehydration, Lighting,- Bays For Buses Intended For Blowing Up And Getting Passengers,- Waiting Room With Internal Installations: Water And Sewage, Central Heating, Air Conditioning, Mechanical, Electrical, Lighting, Monitoring, Together With The Necessary Infrastructure And Energy-Saving Lighting Supported By Electricity From Photovoltaic Panels,- Water And Sewage Connections, Electricity,- Elements Of Small Architecture- Resting Sheds With Benches With The Possibility Of Mounting Panels Photovoltaic, Benches, Garbage Bins,- Two Sheds For Bicycles,- Self-Service Bicycle Repair Point,- Vertical And Horizontal Marking,- Active Pedestrian Crossing Along The Poviat Road 1308T (Cedzyna- Leszczyny) Along With The Pavement On The Section From The Pedestrian Crossing To Plot No. 802/68.2. The Contractor Undertakes To Perform All The Works Described In Documentation, Including The Functional And Use Program, Construction Works Necessary To Implement The Subject Of The Contract. The Execution Of Construction Works That Have Not Been Specified In The Preface Of Works And Are Necessary To Perform The Subject Of The Contract In Accordance With The Documentation Does Not Require A Separate Contract. 3. All Work Near The Existing Utilities (Teletechnical Cables, Sewage Cables, Water Supply) Should Be C