Construction Work - Charging Infrastructure At Hårlev Station. The Contractor Undertakes To Design And Perform A Full Charging Infrastructure System Com-Patible With The Battery-Powered Rolling Stock Described In Contract Appendix 1, Requirements Specification. The Contract Includes A Complete Power Supply Infrastructure And Overhead Contact Line Sys-Tem, To Be Able To Perform Dynamic And Static Charging For Battery Trains: Hårlev Station • Overhead Contact Line System Covering The Three Main Tracks At The Station • 50/25Kv Transformer Solution To Ensure Power To The Overhead Contact Line System • Detailed Design • 400V Power To Train Maintenance Systems And Heating And Cleaning • Safety And Interoperability Approval • All Necessary Cable Works On The Station Including Cable Trays • Immunization Of The Station Signaling Systems • Low Voltage: Replacement Of Existing Electrical Panels With Class Ii Panels • Earthing & Bonding The Station And Staging Area, And Creating New Cable Routes • Test And Commissioning Including Handover To Operation • Scada System • Maintenance And Operation Of The Scada System
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.