Laboratory Building Construction Work - 43.1: 25E00062 Ventilation -Technical Systems (21990004 - Cau / New Building Ceteb). Complete Ventilation Systems (Kg 430) For A Fully Cellared Laboratory Building, Floor Space 51*57M, With Four Above -Ground Full Shot And A Relay Floor. Central Components: Exterior/Advanced Structures, Rlt Devices, Process Air, Smoke Extraction, Fans, Various Air Ducts Made Of Sheet Steel And Plastic, Round And Rectangular, Flexible Pipe Systems, Line Installation And Accessories, Fire Protection Flaps, Bulkheads, Smoke Extraction Systems, Insulation Work Approx. 3,000 M² Air Canals Approx. 1,500M Round Pipe Including Formpieces Pp Approx. 230 Pcs. Volume Current Controller (Div. Dn) Approx. 260 Pieces. Fire Protection Flaps In Various Sizes 3 Pcs. Rlt Central Devices (Zul V Per Device: 32,000 M³/H, Oj 2* 32,000 M³/H 1* 28,000 M³/H) 2 Pcs. Smell System Approx. 230 Pcs. Silk Damper Round (Div. Dn) 3 Pcs. Surbinking Fans Several 1,000 M² Thermal Insulation Work Channels/Pipes
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.