Landscaping Work- New Building Combined Indoor And Outdoor Pool In Memmingen; Streets, Paths, Places. The City Of Memmingen, Stadtwerke Memmingen, Is Planning To Build A New Combined Halls And Outdoor Pool As An All -Year Bath, Stadtbadallee 3 (Flnr. 3757/10, 3757/11 And 3747/3). The Entire Building Is Designed And Planned As A Passive House. All Construction Structures Meet The Requirements Of A Passive House And Are Met In Close Coordination With Building Physics. The New Building Is To Be Realized On The Area Of The Existing Outdoor Pool After Demolition Of The Inventory. The New Combined Bath Includes A 25-Meter Swimming Pool With 8 Lanes In The Indoor Pool Area, A Jumping System 1 Meter / 3 Meters, A Teaching Pool With Approx. 12.5 X 10 Meters, A Course Pool With Lifting Floor, A Small Children, And Other Attractions. In The Area Of The Outdoor Pool, A 50-Meter Pool With 6 Lanes, A Non-Swimmer Pool With Approx. 500 M² With Various Attractions And A Small Children With Approx. 100 M². In Addition, A Beach Volleyball Field, A Playground And The Like, Outbuildings With Changing Rooms, Sanitary Areas And Kiosk Are Built In The Outdoor Facilities. The Opening Of The Combined Halls And Outdoor Pool Is Planned In The Period From 10.07.2026 To 12.07.2026. When Placing The Order, The Contractor Must Provide Proof Of The Effective Existence Of A Business Liability Insurance, Including A Basic Environmental Cap For The Time Of Order Fulfillment For His Company. The Cover Amounts Must Be At Least: Eur 2,000,000 For Personal Injury, Eur 1,000,000 For Other Damage. Further Details Can Be Found In The Service Description. The Contract Begins With A Surcharge (Probably 26. Kw 2025). Start Of The Work Within 12 Working Days After Receipt Of The Request By The Client (§ 5 Paragraph 2 Sentence 2 Vob/B). The Request Is Expected To Be Up To 36Th Kw 2025. The Performance Must Be Completed (Ready To Take Off) Within 216 Working Days After The Deadline Mentioned Above For The Start Of Execution. Individual Deadline Bathing Plate - 72 Working Days, Single Period Of Bathroom - 60 Working Days, Single Deadline Outdoor Pool Area With Shadow Garden - 48 Working Days, Single Deadline Chestnut Avenue, Parking Lot And City Pool Avenue - 108 Working Days.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.