Refurbishment Work - Renewal Of Széchenyi Square And Votive Church. Szabadság Street From Rákóczi Street To Széchenyi Square Public Rehabilitation Work: Architectural, Supporting, Industrial, Electricity, Road Construction, Utility Building And Horticultural Work: - Complete Resolution Of Spacecraft And Roads, And Plans To Build Up, With Control, Traffic Technology, - Renewal Of Public Lighting, - Rainwater Drainage Utilities - Placement Of Street Furniture, - Green Space Renewal, - Other Related Work. Szabadság Street From Széchenyi Section To Szentháromság Street Public Rehabilitation Work, Plus Street Development: Architectural, Supporting, Operational, Electricity, Village, Utility Construction And Horticultural Work: Construction, - Renewal Of Public Lighting, - Rainwater Drainage Utilities, - Placement Of Street Furniture, - Green Space Renewal, - Other Related Work. Theater Street Rehabilitation Work: Architectural, Supporting, Industrial, Mechanical, Electricity, Utility Building And Horticultural Work: - Complete Resolution And Plans To Be Rebuilt, - Demolition Of Transformer And Construction Of A New Transformer, - Renewal Of Public Lighting, - Placement Of Street Furniture. The Work Creates A Modern Public Space For Mass -Storage And Events In Accordance With The Monumental Environment. The Work Shall Be Carried Out As A General Contractor On The Basis Of The Available Design Documentation, Official And Specialist Authorities And Contributions, While Ensuring The Accessibility Of Buildings Next To The Workspaces And Cooperation With The Organizations Implementing Other Project Elements Of The Mohács 500 Program. Existing Healthy Trees Are Planned To Be Protected And 51 Trees, 6812 Shrubs, 5088 Perennial Plants Will Be Installed. Main Quantitative Data: - Demolition Of Asphalt Road With A Full Structural Layer: 3911 M2, - Concrete Paving Spacing With A Total Structural Layer Order: 12065 M2, - Natural Stone Large Cube And Small Cube Pavements With Total Structural Layers: 5773 M2, Demolition: 1532 M2, - In The Monumental Environment Small -Elemental Pavements: Natural Stone (Basalt And Big Cube, Granite Small Cube, Granite Sheet) Preparation Of Full Structural Layers: 19388 M2, - Prefabricated Large -Scale Reinforced Concrete Field Stairs. To Make A Layer Order: 1