It Must Be Demolished And Rebuilt 2 Ponds; Dam North And Dam West. Both Ponds Are Today Slim Concrete Ponds, With Support Filling On The Air Side. The Concrete Is Partly Cracked. The New Ponds Are Designed As Gravitational Ponds In Concrete, Attached To Mountains With Mountain Bolts. Dam North Will Be Established With Flood Overflow And Tap Organ. The Access Road To The Construction Area From Where The Municipal Road Ends At Taraldsvikfossen Is A Hiking Route That Will Be Upgraded To Cope With The Transport Of Construction Equipment. The Upgraded Road Should Remain Permanent For Better Accessibility For Different User Groups, As Well As For Driving Ski Runs In Winter.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.