Ozuboshal Car Kamaz 66115, 2011 15T Transportation Distance - 1 Km. 1St-Grade Load, Drilling Of The Ground By Transporting To A Distance Of 10 M, Buldozers Strength: 96 (130) Kw (A.G.), Group 4 Group (Construction Site Cleaning), Filling Of The Pits And Trenches By Changing The Ground To The Distance From The Ground To 5 M: 96 (130) Kwh: 96 (130) Kw (A.G.), 3Rd Group, Quality Casting, Casting), To Add To The Change In The Change Of Every Next 5 M Of The Ground: 01-01-034-3, Drilling By Transporting The Ground To A Distance Of 10 M, Bulldozers Power: 96 (130) Kw (A.G.), Group 4 Ground (Lack Ground), Additional Of The Soil Of The Soil In The Next 10 M Transportation: 01-01-031-4 To The Norm, Construction Of Dams, Dams, Cuts Of The Screenshots And Dry Cubes By The Construction Of Low-Growing Masses And Masses To 16 T (Compression), Setting The Walls Of Reference Walls And Basement: From Butobeton (Stone-Concrete Protection Paragraph B15, W4, F50), Negotiated Natural Stone (Rented Transportatory): Download, Hand-Drilling Without Fasting In Sloped Trenches In Sloped Trenches To 2 M, Group Of Group: 4 (Manually Drilling After Excavator), Wetting With Water Compacted Soil (Stone), Closing Of Seams During The Fastening Of The Slopes Of The Slopes Of The Slopes Of The Cannons: With Hot Bitumen-Polymer Mastic (Heating Seams), Vertical Concrete Surface Painting Insulation: 2 Layers, Diluted Bitumen (Sections Of Water In Contact With Water), The Capacity Of The Clique Was Thrown Away By The Opposite Challenge Or Reflect With 0.65 (0.5-1) M3, Group Of Group: 4
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.