Architectural, Construction, Engineering And Inspection Services - Tendering Total Counseling - Renovation Of Østre School. The Offer Relates To Total Advice In Connection With The Renovation Of Østre Schools Wing A And E In Middelfart Municipality. Total Advisor Must Perform Initial Advice (Idea Presentations And Construction Programs), Planning, Tender, Execution, Delivery And Commissioning Of The Renovation Work And The Settlement Of 1 Year Review. Total Advisers Services Must Be Based On A School Renovation Plan From 2016 As Well As An Idea Presentation From 2021, Where The Eastern Schools Management, Parent Board, Students And Staff Drew Up A Vision For The Future Physical Framework For The School. Based On These, The Total Advisor, Together With Middelfart Municipality, Project Group And Building Committees, Must Further Develop And Concretize A New Idea For Renovation Of Østre Schools Wing A And E, Which Fits Into The Politically Decided Extent. Total Advisor Must Have The Main Focus Of The Long -Term Maintenance Aspects, Including The Repair Of Indoor Climate Problems, Surfaces, Climate Screen And Technical Installations. Furthermore, An Educational Update Must Also Be Included To A Limited Extent. The Renovation Is Expected To Include The Following: Flew A: - Solution Of Indoor Climate Problems (Moisture And Lack Of Ventilation), Including Replacement Of Windows, Partial Cover Of Brick Facades, Review Of Roofs For Leaks, Establishment Of Scope Drain, Central Ventilation, Sun Protection To The South, New Heating System/Installation And Led Lighting. - Internal Walls, Floors And Ceilings Must Be Renovated Thoroughly. - The Floors Must Be Made Available And Level -Free When Establishing Elevator/Lift. It Must Serve All Floors In Wing A, E And The Basement Under Wing B. - Wind Trap In The Southeast Corner Of The Building Must Be Renovated And Possibly. Rethinked. - A Minimum Of Educational Update, But With A Constant Focus On Whether, As Part Of The Update Of The Building Aspects, At No Significant Cost, There Can Be Some Form Of Educational Update. - Updating It And Av Equipment. Wing E: - Solution Of Indoor Climate Problems (Moisture And Lack Of Ventilation), Including Review Of Roofs For Leaks, Establishment Of Scope Drainage, Central Ventilation, New Heating System/Installation And Led Lighting. - Internal Walls, Floors And Ceilings Must Be Renovated Thoroughly. - A Minimum Of Educational Update, But With A Constant Focus On Whether, As Part Of The Update Of The Building Aspects, At No Significant Cost, There Can Be Some Form Of Educational Update. - Updating Of It And Av Equipment Furthermore, Level-Free Access Must Be Established At All Doors In The Affected Areas. The Buildings Contain Asbestos In Pipe Insulation And Adhesive Under Linoleum And Vinyl, Pcbs At Lower Concentrations (Below The Limit Value Of Indoor Air) And Heavy Metals. In Addition, Possibly Other Environmentally Hazardous Substances Have Not Yet Been Investigated. The Task Therefore Also Contains Handling Of This. Reference Is Made To The Total Tender Material, Including The Total Advisor Agreement With Appendices For Further Description Of The Scope Of The Tasks. The Renovation Will Take Place While Other Parts Of Shoes